Welcome to the podcast inside 
the CPS for HANA Cloud. 

2
00:00:14,280 --> 00:00:17,680
There's no customer success 
without product success and 

3
00:00:17,680 --> 00:00:21,680
project success. 
I'm Fernando Rodriguez, part of 

4
00:00:21,680 --> 00:00:25,200
cloud ERP product success, 
enablement and adoption team. 

5
00:00:25,480 --> 00:00:28,400
And I'm here today with two SAP 
colleagues as guest. 

6
00:00:28,560 --> 00:00:32,840
First, we have Francisca, who 
she's senior product specialist 

7
00:00:32,840 --> 00:00:36,600
for SA PS for Anna Cloud. 
And we also have Jens Figure who

8
00:00:36,600 --> 00:00:40,760
is service engineering architect
in SAP Enterprise Cloud 

9
00:00:40,760 --> 00:00:42,960
Services. 
Thank you very much for joining 

10
00:00:42,960 --> 00:00:45,800
me in this episode. 
Today, we will discuss the 

11
00:00:45,800 --> 00:00:49,840
importance of upgrades in SA PS 
for HANA Cloud Private Edition 

12
00:00:50,080 --> 00:00:54,080
SA PS release strategy and how 
to make regular updates and 

13
00:00:54,080 --> 00:00:58,720
upgrades part of your IT 
strategy and planning cycles. 

14
00:00:59,120 --> 00:01:01,440
So first questions go to you, 
Francie. 

15
00:01:01,440 --> 00:01:04,760
Why are upgrades so important 
for SAP customers? 

16
00:01:05,200 --> 00:01:07,200
Hi Fernanda. 
And first of all, thank you for 

17
00:01:07,200 --> 00:01:09,800
having us. 
Yeah, upgrades are very 

18
00:01:09,800 --> 00:01:13,160
important for SAP customers. 
The end to end responsibility 

19
00:01:13,160 --> 00:01:16,680
for upgrades and updates is for 
S for HANA Cloud Private Edition

20
00:01:16,680 --> 00:01:20,240
customers on their own side and 
to reap the full benefits of 

21
00:01:20,240 --> 00:01:24,040
cloud ERP, it is essential to 
keep the systems agile by 

22
00:01:24,040 --> 00:01:27,200
following a clean core approach 
and keeping them up to date with

23
00:01:27,200 --> 00:01:30,800
the latest patches, feature 
packages and also with releases.

24
00:01:31,320 --> 00:01:34,920
By applying updates and upgrades
regularly, customers can ensure 

25
00:01:34,920 --> 00:01:39,000
that their ERP system stays 
secure, compliant, agile and 

26
00:01:39,000 --> 00:01:41,440
stable. 
Upgrades are the foundation for 

27
00:01:41,440 --> 00:01:43,560
consuming our latest 
innovations. 

28
00:01:43,960 --> 00:01:47,160
All releases and feature packet 
stacks come with a wide range of

29
00:01:47,160 --> 00:01:49,960
innovations. 
To give you some examples, with 

30
00:01:49,960 --> 00:01:53,880
the 2023 release tool, the 
Virtual Assistant based on 

31
00:01:53,880 --> 00:01:57,760
business AI became available for
rice customers along with 

32
00:01:57,760 --> 00:02:00,840
sustainability features and many
business application 

33
00:02:00,840 --> 00:02:03,600
innovations. 
And customers already paid for 

34
00:02:03,600 --> 00:02:05,840
these innovations as part of 
their license. 

35
00:02:06,000 --> 00:02:09,759
So we want to encourage them to 
use what they already paid for. 

36
00:02:10,280 --> 00:02:12,560
That's a very, very important 
message, Francie. 

37
00:02:12,560 --> 00:02:16,000
Thanks for explaining in detail.
So what's the clear 

38
00:02:16,000 --> 00:02:17,880
recommendation towards 
customers? 

39
00:02:17,920 --> 00:02:20,840
How often actually should they 
upgrade their system? 

40
00:02:21,680 --> 00:02:25,360
SAP recommends always running 
the latest release or at least 

41
00:02:25,400 --> 00:02:28,760
only one below the latest. 
The latest release is current 

42
00:02:28,760 --> 00:02:33,560
DDS 400-2023 release and in 
October 2025 the next release 

43
00:02:33,560 --> 00:02:36,800
will become available. 
So like announced with the new S

44
00:02:36,800 --> 00:02:40,720
400 release strategy, new 
releases are available every two

45
00:02:40,720 --> 00:02:44,560
years and in between 3 feature 
packet stacks and support packet

46
00:02:44,560 --> 00:02:46,960
stacks. 
The mainstream maintenance for 

47
00:02:46,960 --> 00:02:49,960
each release is extended from 
five to seven years. 

48
00:02:50,560 --> 00:02:54,200
We recommend that our customers 
do not wait for push factors 

49
00:02:54,200 --> 00:02:58,640
like outdated technology. 
Be proactive, upgrade as soon as

50
00:02:58,640 --> 00:03:02,080
a new release gets released, and
quite important, build an 

51
00:03:02,120 --> 00:03:04,920
upgrade routine. 
Have regular upgrades and 

52
00:03:04,920 --> 00:03:07,720
updates as an integral part of 
your IT schedule. 

53
00:03:08,040 --> 00:03:11,280
Use the force of habit with each
single upgrade. 

54
00:03:11,320 --> 00:03:14,240
The upgrade duration will get 
faster and the upgrade project 

55
00:03:14,240 --> 00:03:16,640
gets easier. 
It's a little bit like training 

56
00:03:16,640 --> 00:03:18,760
a muscle. 
The more often you repeat it, 

57
00:03:18,800 --> 00:03:22,480
the better is the effect. 
A great custom example to show 

58
00:03:22,480 --> 00:03:24,920
this positive effect is Hitachi 
High Tech. 

59
00:03:25,360 --> 00:03:28,600
They managed with a regular 
upgrade approach yearly or by 

60
00:03:28,600 --> 00:03:32,240
yearly upgrades to reduce the 
duration for a typical upgrade 

61
00:03:32,240 --> 00:03:36,160
project to a single month. 
Very good, I like very much the 

62
00:03:36,160 --> 00:03:39,000
association you made with 
training a muzzle. 

63
00:03:39,400 --> 00:03:42,160
The more often you repeat, the 
better the effect. 

64
00:03:42,520 --> 00:03:47,200
So with SA PS400 Cloud Private 
Edition moving now to a two year

65
00:03:47,200 --> 00:03:51,680
major release cycle, how can 
business effectively plan their 

66
00:03:51,680 --> 00:03:55,000
upgrades and take advantage of 
these new features without 

67
00:03:55,000 --> 00:03:57,720
experiencing major disruptions? 
Yes. 

68
00:03:58,200 --> 00:03:59,800
Yeah. 
Thanks so much, also from my 

69
00:03:59,800 --> 00:04:02,160
side for having me here. 
And actually, this is a great 

70
00:04:02,160 --> 00:04:05,240
question. 
The key here is to understand 

71
00:04:05,240 --> 00:04:09,040
the role of the feature packages
as outlined by Francisca. 

72
00:04:09,600 --> 00:04:14,160
While the major releases happen 
now only every two years, SAP 

73
00:04:14,160 --> 00:04:17,640
releases 3 feature packages in 
between. 

74
00:04:17,640 --> 00:04:21,160
So in a sense, we're going to 
ship every six months a feature 

75
00:04:21,160 --> 00:04:24,080
package stack. 
These packages offer a more 

76
00:04:24,080 --> 00:04:28,400
digestible way to consume the 
latest innovations as well as 

77
00:04:28,400 --> 00:04:31,920
features. 
Think of it like renovating a 

78
00:04:31,920 --> 00:04:35,080
house. 
Major release upgrades are like 

79
00:04:35,160 --> 00:04:37,680
a big project with noticeable 
changes. 

80
00:04:37,880 --> 00:04:40,520
So you're going to move out, you
demolish everything in your 

81
00:04:40,520 --> 00:04:44,640
house and bring in everything 
from scratch, more or less. 

82
00:04:45,160 --> 00:04:48,360
Feature packages are like 
refreshing a single room in your

83
00:04:48,360 --> 00:04:50,640
house. 
So you get new paint, you get 

84
00:04:50,640 --> 00:04:53,440
new furniture, you bring them 
in, you still live in your 

85
00:04:53,440 --> 00:04:57,840
house, it's just the single room
that going to renovate so it 

86
00:04:57,920 --> 00:05:02,800
enhances your experience without
requiring a complete overhaul. 

87
00:05:03,440 --> 00:05:08,160
Feature packages typically 
involve also a shorter project 

88
00:05:08,160 --> 00:05:11,880
duration and they are by far 
less complex than a major 

89
00:05:11,880 --> 00:05:15,920
release upgrade. 
They don't usually require the 

90
00:05:15,920 --> 00:05:21,200
update of the core components 
like the APA platform or the SAP

91
00:05:21,200 --> 00:05:25,360
HANA database. 
And by aligning your upgrade 

92
00:05:25,360 --> 00:05:29,640
schedule with the release of 
feature packages, we can also 

93
00:05:29,640 --> 00:05:33,360
adopt the new functionalities as
well as technologies in a more 

94
00:05:33,360 --> 00:05:38,360
gradual and manageable way. 
This also leads to minimizing 

95
00:05:38,400 --> 00:05:40,600
disrupt to your business 
operations. 

96
00:05:41,240 --> 00:05:43,520
This is great and really well 
explained. 

97
00:05:43,520 --> 00:05:47,120
So now I think we can have a 
deeper look into planning 

98
00:05:47,120 --> 00:05:50,240
upgrades in the private cloud. 
We have talked about the 

99
00:05:50,240 --> 00:05:54,640
importance of upgrades, right, 
but realistically when we see in

100
00:05:54,640 --> 00:05:57,920
the business they often take 
back seat to other projects. 

101
00:05:57,920 --> 00:06:02,480
So if you could give an advice, 
how can organisations prioritise

102
00:06:02,480 --> 00:06:05,400
upgrades without completely 
derailing their ongoing 

103
00:06:05,400 --> 00:06:08,000
initiative? 
Yeah, that's actually a common 

104
00:06:08,000 --> 00:06:10,040
challenge. 
The key here is the 

105
00:06:10,080 --> 00:06:14,120
communication and the planning. 
Publishing the benefits of 

106
00:06:14,120 --> 00:06:18,000
regular upgrades and updates 
across the overall organization 

107
00:06:18,000 --> 00:06:21,920
is highly crucial. 
When stakeholders understand the

108
00:06:21,920 --> 00:06:25,280
value of regular upgrades and 
updates, whether it's either 

109
00:06:25,280 --> 00:06:29,640
security or the benefits of the 
new features or for sure also 

110
00:06:29,640 --> 00:06:32,000
the efficiency gain your 
business can get out of an 

111
00:06:32,000 --> 00:06:35,960
upgrade, they are more likely to
accommodate the upgrade 

112
00:06:35,960 --> 00:06:38,520
timelines. 
This might require to 

113
00:06:38,520 --> 00:06:42,840
strategically plan such projects
also for sure in order to align 

114
00:06:42,840 --> 00:06:47,160
with the reschedule, as well as 
understanding also the concepts 

115
00:06:47,160 --> 00:06:51,920
of a development freeze as well 
as transport freeze windows. 

116
00:06:52,440 --> 00:06:56,320
Let me give you also an example.
In this case, would you delay 

117
00:06:56,320 --> 00:06:59,960
servicing your car because 
you're planning a road trip? 

118
00:07:00,680 --> 00:07:03,960
Most likely not, because you 
would know that a well 

119
00:07:03,960 --> 00:07:08,160
maintained car is essential for 
a successful road trip and the 

120
00:07:08,160 --> 00:07:12,000
same logic applies also here to 
your SAP software landscape. 

121
00:07:12,480 --> 00:07:16,200
You may also consider the 
separation of the technical 

122
00:07:16,200 --> 00:07:19,480
upgrade from the new feature 
implementation now, like 

123
00:07:19,480 --> 00:07:22,080
introducing the new 
functionality to your business 

124
00:07:22,280 --> 00:07:26,680
either with the maintenance or 
by extensibility or custom code.

125
00:07:27,280 --> 00:07:30,600
Why it might sound counter 
intuitive? 

126
00:07:31,080 --> 00:07:34,160
Running these as separate 
projects with a distinct 

127
00:07:34,160 --> 00:07:38,320
timeline can actually speed up 
both the technical upgrade 

128
00:07:38,320 --> 00:07:42,320
project as well as also the 
implementation of new features 

129
00:07:42,400 --> 00:07:46,000
and functionality. 
And by decoupling them, you also

130
00:07:46,000 --> 00:07:49,760
reduce the bottlenecks and 
ensure your technical foundation

131
00:07:49,760 --> 00:07:54,080
is always up to date, running on
state-of-the-art technology, 

132
00:07:54,240 --> 00:07:58,080
which will then also allow you 
to faster consume our new 

133
00:07:58,080 --> 00:08:00,160
innovations. 
Thank you, Jens. 

134
00:08:00,160 --> 00:08:04,680
And I think it's not only about 
adopting new innovations faster,

135
00:08:04,680 --> 00:08:09,280
but I assume business do not 
upgrade in time, there are 

136
00:08:09,280 --> 00:08:12,960
consequences, right? 
So can you explain us now moving

137
00:08:12,960 --> 00:08:16,680
a bit to Frenzy to hear her 
perspective, What are the 

138
00:08:16,680 --> 00:08:20,640
consequences if customers avoid 
regular upgrades and stay on the

139
00:08:20,640 --> 00:08:24,360
same release for many years? 
Yes, this is really a scenario 

140
00:08:24,360 --> 00:08:27,520
we see quite often. 
So many organization upgrade 

141
00:08:27,520 --> 00:08:31,200
their ERP system really 
infrequently after the expensive

142
00:08:31,200 --> 00:08:34,600
initial implementation project 
and they regularly exceed 

143
00:08:34,600 --> 00:08:38,039
maintenance windows. 
They may keep using the release 

144
00:08:38,039 --> 00:08:41,840
they installed for up to 10 
years and IT organization 

145
00:08:41,840 --> 00:08:45,160
address requests to enable 
Business Innovation during this 

146
00:08:45,160 --> 00:08:49,280
time frame, adding we call it 
nuts and bolts or customization 

147
00:08:49,280 --> 00:08:52,480
balconies essentially custom 
code to the system. 

148
00:08:53,160 --> 00:08:57,040
Even worse, lines of businesses 
may resort to their best of pre 

149
00:08:57,080 --> 00:09:01,160
solutions and this is a quite 
costly approach resulting in a 

150
00:09:01,160 --> 00:09:05,240
vicious circle in which ever 
more complex IT solutions become

151
00:09:05,240 --> 00:09:07,680
ever more challenging to be 
upgraded. 

152
00:09:08,120 --> 00:09:12,440
As a consequence, IT teams lack 
on knowledge and best practices 

153
00:09:12,480 --> 00:09:17,000
related to upgrades, also to 
reusable project practices and 

154
00:09:17,000 --> 00:09:19,480
such helpful assets as test 
automation. 

155
00:09:20,320 --> 00:09:22,640
They're good so far. 
We have talked about the 

156
00:09:22,640 --> 00:09:26,120
consequences of not performing 
regular maintenance and the 

157
00:09:26,120 --> 00:09:29,600
importance of through planning 
for system landscape upgrades. 

158
00:09:30,000 --> 00:09:34,080
But realistically, as we know, 
downtime is a significant 

159
00:09:34,080 --> 00:09:36,440
concern for businesses. 
Yes. 

160
00:09:36,440 --> 00:09:40,160
How can companies, especially 
those using RISE with SAP, 

161
00:09:40,720 --> 00:09:43,520
minimize the impact of upgrades 
on their operations? 

162
00:09:44,040 --> 00:09:46,200
Yeah, thanks. 
This is a crucial question. 

163
00:09:46,720 --> 00:09:49,400
It touches a topic that is very 
dear to my heart. 

164
00:09:49,600 --> 00:09:52,120
You know, I'm the former product
manager for zero down time 

165
00:09:52,120 --> 00:09:53,840
upgrade. 
So I have talked so much to 

166
00:09:53,840 --> 00:09:56,160
customers about reducing the 
down time. 

167
00:09:56,560 --> 00:09:59,520
And we all know that there is no
business that wants to be 

168
00:09:59,520 --> 00:10:01,720
offline. 
There is no business that likes 

169
00:10:01,720 --> 00:10:04,640
down times, not even for a 
planned upgrade. 

170
00:10:04,800 --> 00:10:07,920
A down time is something where 
the business says, yeah, here 

171
00:10:07,920 --> 00:10:10,000
you get the five hours window 
from our end. 

172
00:10:10,520 --> 00:10:14,600
But the good news here is that 
Rise with SAP is designed with a

173
00:10:14,600 --> 00:10:18,760
minimal disruption in mind. 
So we utilize the NZ team, the 

174
00:10:18,760 --> 00:10:21,880
near 0 downtime maintenance 
approach of the technical 

175
00:10:21,880 --> 00:10:25,880
upgrade tool by default. 
So that essentially also means 

176
00:10:25,880 --> 00:10:30,080
the technical downtime is 
reduced drastically by default 

177
00:10:30,200 --> 00:10:32,320
in our Rise with SAP 
environment. 

178
00:10:32,680 --> 00:10:37,360
If this is not sufficient, SAP 
Enterprise Cloud Services also 

179
00:10:37,360 --> 00:10:41,600
offers the 0 downtime option of 
the upgrade tool, which then 

180
00:10:41,600 --> 00:10:45,360
further reduces the technical 
downtime when upgrading or 

181
00:10:45,360 --> 00:10:49,160
updating an SAPS for HANA system
down to a restart of the 

182
00:10:49,160 --> 00:10:52,520
application servers. 
However, the downtime that I 

183
00:10:52,520 --> 00:10:55,680
talked about here is just a 
technical aspect, but we have to

184
00:10:55,680 --> 00:10:59,400
have a look to the complete 
picture and the complete picture

185
00:10:59,400 --> 00:11:04,400
means a business downtime which 
is the end to end perspective 

186
00:11:04,840 --> 00:11:08,280
downtime that a business is 
facing and that comprises 

187
00:11:08,280 --> 00:11:12,800
usually the technical downtime 
and Rise with SAP also offers 

188
00:11:12,800 --> 00:11:16,200
here a pre configured 
optimization measure and also a 

189
00:11:16,200 --> 00:11:19,400
range of solutions that can 
further reduce the overall 

190
00:11:19,400 --> 00:11:22,840
business downtime. 
For example, you can leverage 

191
00:11:22,840 --> 00:11:27,440
automation tools to do the IT 
administrative tasks like for 

192
00:11:27,440 --> 00:11:30,840
ramping down and ramping up the 
system, as well As for sure 

193
00:11:30,840 --> 00:11:35,120
making use of test automation 
tools that are part of the SAP 

194
00:11:35,320 --> 00:11:37,960
Cloud application life cycle 
management. 

195
00:11:38,360 --> 00:11:41,840
This allows your critical 
business processes to keep 

196
00:11:41,840 --> 00:11:45,640
running smoothly and to keep the
downtime as short as possible. 

197
00:11:46,520 --> 00:11:51,680
Plus, SAP and it's partners also
offer services for sure to help 

198
00:11:51,680 --> 00:11:55,120
you to tailor the solutions and 
approaches that I just talked 

199
00:11:55,120 --> 00:11:59,240
about to your specific needs, 
requirements and demands. 

200
00:11:59,720 --> 00:12:05,320
So we got all the tools by hand 
to truly minimise the impact of 

201
00:12:05,440 --> 00:12:09,040
upgrades and upgrades to your 
day-to-day operations. 

202
00:12:09,920 --> 00:12:12,080
Thank you very much, Jens. 
I think you brought here 

203
00:12:12,080 --> 00:12:15,760
valuable news for our audience. 
It's very interesting to hear 

204
00:12:15,760 --> 00:12:20,040
about the 0 downtime option. 
Francie, now moving to you. 

205
00:12:20,040 --> 00:12:23,360
We heard that a new upgrade 
white paper was released. 

206
00:12:23,720 --> 00:12:27,080
Can you quickly summarise what 
is it about and how it is 

207
00:12:27,080 --> 00:12:31,320
guiding customers? 
Very happy to do so, as we know 

208
00:12:31,320 --> 00:12:34,840
from a lot of other customers 
that they quite often have a lot

209
00:12:34,840 --> 00:12:38,840
of concerns regarding upgrades 
and avoid upgrades and updates 

210
00:12:38,840 --> 00:12:42,160
as long as possible, for example
until the end of mainstream 

211
00:12:42,160 --> 00:12:46,120
maintenance is approaching. 
And with our white paper, we try

212
00:12:46,120 --> 00:12:49,720
to show customers all the 
benefits of regular upgrades and

213
00:12:49,720 --> 00:12:53,240
why it is so crucial to have a 
regular upgrade and update 

214
00:12:53,240 --> 00:12:55,960
behavior. 
So the document with the 

215
00:12:55,960 --> 00:13:00,400
official title Embrace Agility 
and Upgrade for Success is 

216
00:13:00,400 --> 00:13:04,320
really designed to help IT 
leaders to achieve regular 

217
00:13:04,320 --> 00:13:07,520
upgrades. 
It summarizes the benefits of 

218
00:13:07,520 --> 00:13:11,400
regular upgrades and also 
highlights SAP recommended best 

219
00:13:11,400 --> 00:13:15,600
practices and also guidance for 
rise with SAP customers. 

220
00:13:16,240 --> 00:13:19,800
The document also includes a 
high level guidance on how to 

221
00:13:19,800 --> 00:13:23,960
build regular updates and also 
upgrade routine with links to 

222
00:13:23,960 --> 00:13:28,040
more detailed assets and tools. 
And we can of course, include a 

223
00:13:28,040 --> 00:13:31,360
link to this upgrade white paper
to the podcast description. 

224
00:13:32,080 --> 00:13:35,880
Very good Franzi and Yanz, I'm 
sure the audience would take the

225
00:13:35,880 --> 00:13:38,920
chance to have a look on this 
detailed documentation that can 

226
00:13:38,920 --> 00:13:42,440
be so beneficial for business to
make them understand the 

227
00:13:42,440 --> 00:13:44,680
importance of the upgrades in 
SAP. 

228
00:13:44,760 --> 00:13:48,280
As for HANA Cloud Private 
Edition, thank you very much for

229
00:13:48,280 --> 00:13:51,000
joining this episode. 
It was a pleasure to talk to 

230
00:13:51,000 --> 00:13:53,840
you, understand and learn a bit 
more about the topic. 

231
00:13:54,400 --> 00:13:56,080
Thank you so much for having us 
here. 

232
00:13:56,200 --> 00:13:58,160
Was a pleasure to speak in your 
podcast. 

233
00:13:58,920 --> 00:14:00,960
Absolutely. 
Thank you for inviting us. 

234
00:14:02,320 --> 00:14:05,600
For our audience, if you like 
this episode and have ideas 

235
00:14:05,600 --> 00:14:09,000
about the next relevant topics 
for this podcast, send us an 

236
00:14:09,000 --> 00:14:10,800
e-mail. 
We'll be happy to read your 

237
00:14:10,800 --> 00:14:12,960
message. 
You can use the address 

238
00:14:12,960 --> 00:14:19,080
insideasfor@sap.com TuneIn next 
time and be inside a CPS 400 

239
00:14:19,080 --> 00:14:19,440
cloud.