1
00:00:11,840 --> 00:00:14,200
Hello everybody and welcome to 
the SAP Learning Insights 

2
00:00:14,200 --> 00:00:16,079
podcast. 
My name is David Shariano. 

3
00:00:16,200 --> 00:00:18,240
Today we're talking SAP field 
glass. 

4
00:00:18,240 --> 00:00:20,320
What is it? 
Let's clarify some myths about 

5
00:00:20,320 --> 00:00:23,400
it and how can it be used. 
The guide us through today's 

6
00:00:23,400 --> 00:00:27,680
discussion is Sebastian Ribble 
of SAP Field Glass Pre Sales. 

7
00:00:28,200 --> 00:00:30,560
Hello Sebastian. 
With the start of every episode,

8
00:00:30,560 --> 00:00:32,720
we always want to get our hero's
origin story. 

9
00:00:32,960 --> 00:00:35,520
Can you take the time to 
introduce yourself and tell us 

10
00:00:35,520 --> 00:00:37,320
how you became the professional 
you are today? 

11
00:00:37,840 --> 00:00:39,760
Hi David. 
Thank you for inviting me to 

12
00:00:39,760 --> 00:00:41,200
your podcast. 
It's a pleasure. 

13
00:00:41,920 --> 00:00:44,560
I'm Sebastian Rabul. 
I'm an electronic engineer with 

14
00:00:44,560 --> 00:00:46,840
a specialization in 
telecommunications by background

15
00:00:47,240 --> 00:00:50,880
and after, you know, over 20 
years working in the telco 

16
00:00:50,880 --> 00:00:53,200
business. 
I was looking to expand into 

17
00:00:53,280 --> 00:00:56,760
other industries and almost five
years ago I started a 

18
00:00:56,760 --> 00:00:59,480
fascinating opportunity with the
SAP figures as a presale 

19
00:00:59,480 --> 00:01:03,440
engineer in LA Town that allowed
me to achieve that goal. 

20
00:01:03,880 --> 00:01:05,680
We'll talk more about it in a 
moment. 

21
00:01:06,440 --> 00:01:10,920
I'm currently based in Madrid 
covering a Mia S region, but we 

22
00:01:10,920 --> 00:01:14,400
can say that I'm from the world 
indeed. 

23
00:01:14,400 --> 00:01:17,880
So we spoke offline before the 
recording the podcast, and it 

24
00:01:17,880 --> 00:01:20,400
sounds like you had a bit of an 
exciting journey that took you 

25
00:01:20,400 --> 00:01:21,720
through several countries in the
world. 

26
00:01:22,520 --> 00:01:26,120
Yes, yes indeed. 
I was born in Paraguay and when 

27
00:01:26,160 --> 00:01:29,920
I was just a baby, my parents 
moved to Argentina. 

28
00:01:29,920 --> 00:01:31,840
So I grew up there in Buenos 
Aires. 

29
00:01:32,000 --> 00:01:35,680
I came back to Paraguay again to
conclude my studies and 

30
00:01:35,960 --> 00:01:40,520
expatriated to Mexico. 
And last six years I lived in 

31
00:01:40,520 --> 00:01:44,000
Mexico City and now it's time to
Spain, OK. 

32
00:01:44,000 --> 00:01:48,360
And I assume that your telco job
was what was moving year round 

33
00:01:48,360 --> 00:01:52,840
so much was it? 
Yes, I was worldwide bracelet. 

34
00:01:53,080 --> 00:01:56,520
I was based in Mexico at that 
time and covering pretty much 

35
00:01:56,520 --> 00:02:01,000
the old countries from whole 
Latin America of course because 

36
00:02:01,000 --> 00:02:05,800
of my Spanish, but I work on 
with opportunities in Seychelles

37
00:02:05,840 --> 00:02:08,479
or Japan. 
OK, all right. 

38
00:02:08,479 --> 00:02:11,800
So you have a global perspective
on all things pre sales. 

39
00:02:12,360 --> 00:02:15,760
So specifically about SAP Field 
Glass, would you be able to take

40
00:02:15,760 --> 00:02:18,640
a moment and explain what it's 
all about off the top of my 

41
00:02:18,640 --> 00:02:21,720
head, So I whenever I schedule 
in these podcasts, I try not to 

42
00:02:21,720 --> 00:02:24,680
go too deeply into the topic 
that I'm want to talk about just

43
00:02:24,680 --> 00:02:27,560
so I can look at it with some 
fresh eyes and from a beginner's

44
00:02:27,560 --> 00:02:30,360
perspective and on the top of my
head, the first thing that pops 

45
00:02:30,360 --> 00:02:34,120
up is recruiting of seasonal 
workers, so like temporary 

46
00:02:34,120 --> 00:02:36,920
workforce, that sort of thing. 
Is that what SAP Field Glass is 

47
00:02:36,920 --> 00:02:38,640
managing? 
Well, you're right. 

48
00:02:38,840 --> 00:02:41,400
It's part of it. 
But that's not all. 

49
00:02:42,000 --> 00:02:47,720
SAP figures is VMS Vendor 
Management System cloud base 

50
00:02:47,960 --> 00:02:50,400
that helps organizations 
supporting the subcontracting 

51
00:02:50,400 --> 00:02:54,840
services and external workers 
processes either through 

52
00:02:54,920 --> 00:02:58,120
sourcing problem, hiring 
contingent labour workers which 

53
00:02:58,120 --> 00:03:01,720
is the one you mentioned now 
asking suppliers independent 

54
00:03:01,720 --> 00:03:04,440
contractors for the staffing 
first to provide candidates for 

55
00:03:04,440 --> 00:03:06,960
covering certain jobs or 
temporary assignments. 

56
00:03:07,360 --> 00:03:10,640
And then after hiring them 
tracking the service delivery 

57
00:03:10,840 --> 00:03:15,960
and paying the agreed fees or 
another way could be through 

58
00:03:15,960 --> 00:03:20,400
service contracts or service 
orders defining a scope that of 

59
00:03:20,400 --> 00:03:24,000
course will be delivered off by 
people that we need to control 

60
00:03:24,000 --> 00:03:27,240
as well collaborating with 
suppliers which is one of the 

61
00:03:27,240 --> 00:03:30,680
main benefits, the collaboration
interacting through digital 

62
00:03:30,680 --> 00:03:33,280
channels making all process more
efficient. 

63
00:03:33,800 --> 00:03:37,320
But this collaboration is also 
extended internally with 

64
00:03:37,320 --> 00:03:41,680
different users based on their 
functions like procurement, HR, 

65
00:03:41,960 --> 00:03:46,320
IT compliant officers etc. 
So it will be a single solution 

66
00:03:46,480 --> 00:03:50,680
to manage holistically all your 
services all working together 

67
00:03:50,840 --> 00:03:52,920
for the same objective. 
OK. 

68
00:03:53,000 --> 00:03:57,440
So it's more than just temporary
workers, It also could cover 

69
00:03:57,640 --> 00:04:01,800
things like a service orders 
like would maintenance also be 

70
00:04:01,800 --> 00:04:04,400
something that field glass would
be covering, so like the regular

71
00:04:04,920 --> 00:04:08,080
servicing of a piece of 
infrastructure in your company, 

72
00:04:08,080 --> 00:04:10,920
something like that? 
Yes, you have to look at the 

73
00:04:10,920 --> 00:04:15,120
field glass, like if you have a 
service management, you know in 

74
00:04:15,240 --> 00:04:19,800
all companies has services, then
field glass has a place there. 

75
00:04:20,440 --> 00:04:22,280
OK. 
So what sort of industry is this

76
00:04:22,280 --> 00:04:24,520
field glass used in? 
All of them. 

77
00:04:25,120 --> 00:04:29,280
SAP figures is agnostic to the 
industry and the type of service

78
00:04:29,800 --> 00:04:33,760
and the flexibility it offers 
allows to adapt to our customers

79
00:04:33,760 --> 00:04:36,320
businesses. 
We have thousands of customers 

80
00:04:36,320 --> 00:04:41,640
around almost 190 countries in 
all industries from mining and 

81
00:04:41,640 --> 00:04:45,480
oil and gas to manufacturers, 
retail, education, security 

82
00:04:45,480 --> 00:04:48,320
etcetera. 
Now our focus is on those 

83
00:04:48,320 --> 00:04:51,840
companies where services are 
part of the core business. 

84
00:04:52,200 --> 00:04:56,040
Are service intensive like for 
example the one you mentioned 

85
00:04:56,400 --> 00:05:00,080
preventive, corrective or shoot 
down maintenance on industry 

86
00:05:00,080 --> 00:05:04,600
plans or professional services 
that will be revealed to 

87
00:05:04,600 --> 00:05:10,280
customers as well as paying the 
suppliers or for example IT or 

88
00:05:10,280 --> 00:05:13,000
software services in financial 
industry. 

89
00:05:13,000 --> 00:05:17,160
And we will talk more about some
examples I believe during this 

90
00:05:17,160 --> 00:05:18,520
session. 
OK. 

91
00:05:18,600 --> 00:05:20,320
All right. 
So now that I'm getting a a 

92
00:05:20,320 --> 00:05:22,800
bigger picture of what the 
solution does. 

93
00:05:23,280 --> 00:05:25,720
Some questions are arising 
regarding overlap with 

94
00:05:25,720 --> 00:05:30,400
pre-existing SAP solutions. 
So for example SAP 

95
00:05:30,400 --> 00:05:32,960
SuccessFactors, they have a 
recruiting module but field 

96
00:05:32,960 --> 00:05:36,880
glass is also having a module 
that brings people into the 

97
00:05:36,880 --> 00:05:38,840
workforce. 
What's the difference between 

98
00:05:38,840 --> 00:05:41,080
these two things? 
Are they interchangeable or do 

99
00:05:41,080 --> 00:05:44,640
they integrate in some way? 
This is a very interesting 

100
00:05:44,640 --> 00:05:46,440
question. 
David and I will take some time 

101
00:05:46,440 --> 00:05:50,080
to explain. 
In fact, SAP SuccessFactors and 

102
00:05:50,080 --> 00:05:53,720
Figures are complementary 
solutions and together we make 

103
00:05:53,800 --> 00:05:57,280
the total workforce management 
like no other can offer. 

104
00:05:57,640 --> 00:06:01,280
I want an account solution to 
administrate both employees and 

105
00:06:01,280 --> 00:06:05,120
externals respectively through 
product ties or native 

106
00:06:05,120 --> 00:06:09,720
integrations between both for an
smooth and efficient 

107
00:06:09,800 --> 00:06:13,920
administration of processes. 
People think that you know HCM 

108
00:06:13,920 --> 00:06:17,240
or Human Capital solution. 
Will administrate all type of 

109
00:06:17,240 --> 00:06:19,600
people, but this is not 
recommended. 

110
00:06:19,880 --> 00:06:23,480
For example, an employee is pay 
via salary payable. 

111
00:06:24,080 --> 00:06:27,840
However you need a procurement 
process for paying your 

112
00:06:27,840 --> 00:06:31,120
outsourced services through a 
purchase order and invoicing. 

113
00:06:31,600 --> 00:06:34,400
Plus there are government 
regulations from country to 

114
00:06:34,400 --> 00:06:38,440
country that you need to take 
care to ensure compliance like 

115
00:06:38,880 --> 00:06:41,240
social responsibility between 
buyer and supplier. 

116
00:06:41,600 --> 00:06:47,240
So in SA PSA factors. 
Companies will run the planning 

117
00:06:47,240 --> 00:06:51,000
will identify the need to hire 
either an employee or a 

118
00:06:51,000 --> 00:06:54,880
contingent worker and once that 
is determined based on 

119
00:06:55,160 --> 00:06:58,720
availability, costs, skills 
etcetera from success factor 

120
00:06:58,720 --> 00:07:01,560
itself triggering the job 
posting. 

121
00:07:01,720 --> 00:07:05,160
That will continue in figures 
through on a smooth and easy way

122
00:07:05,680 --> 00:07:08,680
supported by templates with pre 
configured rules like for 

123
00:07:08,680 --> 00:07:11,760
example how much you will pay 
for that job. 

124
00:07:12,520 --> 00:07:16,600
Where we'll just define the main
info like description of roles, 

125
00:07:16,600 --> 00:07:20,400
the period of time, how many 
people I need or where the 

126
00:07:20,400 --> 00:07:23,840
service will be based. 
This job posting will be sent to

127
00:07:23,840 --> 00:07:28,240
suppliers to analyse their 
talent pool and propose the 

128
00:07:28,240 --> 00:07:31,640
right candidates for the job. 
We will compare candidates 

129
00:07:31,800 --> 00:07:34,920
supported by AI features that 
will be recommending 

130
00:07:35,000 --> 00:07:38,960
automatically the ones that 
better much run interviews. 

131
00:07:39,280 --> 00:07:42,680
Or even doing an analysis 
through anonymization or 

132
00:07:42,680 --> 00:07:46,560
considering diversity, creating 
then a work order, creating the 

133
00:07:46,600 --> 00:07:50,760
onboarding controls and with 
full synchronization with 

134
00:07:50,760 --> 00:07:54,280
SuccessFactors Employee Central,
sending the workers profile for 

135
00:07:54,280 --> 00:07:58,280
visibility into an organization.
But the administration will be 

136
00:07:58,280 --> 00:08:01,480
done in Figlas, ensuring this 
way the compliance of 

137
00:08:01,480 --> 00:08:03,760
regulations and bounding 
unnecessary risks. 

138
00:08:04,000 --> 00:08:06,520
OK. 
So another thing that comes to 

139
00:08:06,520 --> 00:08:09,480
mind, in the previous question, 
we talked about plant 

140
00:08:09,480 --> 00:08:11,800
maintenance, for example, 
service orders, that sort of 

141
00:08:11,800 --> 00:08:14,720
thing. 
As far as I understand, SAPS for

142
00:08:14,720 --> 00:08:19,400
HANA could also manage service 
orders, maintenance operations, 

143
00:08:19,400 --> 00:08:21,240
that sort of thing in some 
capacity. 

144
00:08:21,600 --> 00:08:25,280
Is there a similar way of 
integrating field glass with 

145
00:08:25,400 --> 00:08:27,960
SAPS for HANA in the context of 
plant maintenance? 

146
00:08:28,320 --> 00:08:31,760
Oh yes, you know, I like to say 
that the CP field is like an 

147
00:08:31,760 --> 00:08:33,720
orchestrator of the different 
processes. 

148
00:08:34,120 --> 00:08:37,480
Needed around a service 
administration and integrations 

149
00:08:37,480 --> 00:08:40,520
have to automate them. 
So let me explain more through 

150
00:08:40,600 --> 00:08:43,679
examples. 
If you analyze from procurement 

151
00:08:43,679 --> 00:08:48,640
or financial users point of view
that typically are working on S 

152
00:08:48,640 --> 00:08:54,800
for HANA, ECC or even non 
SAPERPS, they are interested in 

153
00:08:54,840 --> 00:08:58,520
automating some processes with 
the ERP like the creation of the

154
00:08:59,000 --> 00:09:02,000
purchase requisition and 
purchase order as well as the 

155
00:09:02,000 --> 00:09:04,600
service entry sheet. 
And suppliers, invoice 

156
00:09:04,720 --> 00:09:08,720
resolving, therefore the account
payable process, eliminating 

157
00:09:08,720 --> 00:09:12,520
manual errors, reducing cycle 
times and providing full 

158
00:09:12,520 --> 00:09:15,720
transparency and traceability 
for both buyer and suppliers. 

159
00:09:16,440 --> 00:09:20,160
Or in a more complex scenario, 
integrations with SAP plane 

160
00:09:20,160 --> 00:09:22,320
maintenance, for example the one
you just mentioned, 

161
00:09:22,800 --> 00:09:27,000
automatically triggering Planet 
service orders to suppliers and 

162
00:09:27,000 --> 00:09:30,320
collaborating with them over the
service execution through secure

163
00:09:30,320 --> 00:09:32,200
channels without giving access 
to the ERP. 

164
00:09:32,760 --> 00:09:38,920
Avoiding hard to maintain boxes 
in another silos and make users 

165
00:09:38,920 --> 00:09:42,800
working in the same place. 
So if we think on other 

166
00:09:42,920 --> 00:09:46,760
examples, for example, the 
orchestration of physical or 

167
00:09:46,760 --> 00:09:50,160
logical access for workers and 
integrating with an access 

168
00:09:50,160 --> 00:09:54,240
system, so providing an 
authorization during their 

169
00:09:54,240 --> 00:09:57,800
onboarding to have people ready 
at the shortest time reducing 

170
00:09:57,800 --> 00:10:01,200
their forecast because you are 
paying for the services the 

171
00:10:01,200 --> 00:10:04,400
first day. 
That worker jumps in or 

172
00:10:04,400 --> 00:10:09,240
automatically capturing the time
scenes and times out into time 

173
00:10:09,240 --> 00:10:13,040
sheets eliminating errors and 
keeping controls of the cost and

174
00:10:13,040 --> 00:10:16,880
assistance as well and at the 
end the authorizing the access 

175
00:10:17,080 --> 00:10:21,400
when affording and showing the 
security controls where IT or 

176
00:10:21,400 --> 00:10:27,560
security users will put focus. 
SAP figures has more than 200 

177
00:10:27,560 --> 00:10:31,520
APIs available to integrate with
either SAP or non SAP system. 

178
00:10:31,920 --> 00:10:35,680
However, you may think are 
integrations necessary? 

179
00:10:36,120 --> 00:10:37,760
Integrations are not really 
mandatory. 

180
00:10:38,280 --> 00:10:42,040
It can fully operate through an 
standalone deployment. 

181
00:10:42,280 --> 00:10:47,280
And finally, you know the the 
most relevant point here is that

182
00:10:47,360 --> 00:10:51,080
SAP failures, like any other 
solution has a feature called 

183
00:10:51,120 --> 00:10:55,360
Configuration Manager that 
exposes those APIs for customers

184
00:10:55,360 --> 00:10:57,920
to administrate themselves. 
Of course, we are happy to 

185
00:10:57,920 --> 00:11:00,760
support the initiatives these 
customers can bring to us. 

186
00:11:01,080 --> 00:11:04,760
But our customers can enjoy the 
full self administration, All 

187
00:11:04,760 --> 00:11:08,280
right, That makes sense. 
So I'm starting to get a that 

188
00:11:08,280 --> 00:11:10,680
the full picture of how these 
solutions actually work 

189
00:11:10,680 --> 00:11:14,800
together. 
But there's still one more topic

190
00:11:15,080 --> 00:11:18,520
I guess within the category of 
overlap is SAP Arriba. 

191
00:11:18,600 --> 00:11:22,080
So when I hear SAP Arriba, I 
think procurement as well. 

192
00:11:22,640 --> 00:11:25,360
Where is the relationship 
between field glass and Arriba? 

193
00:11:27,040 --> 00:11:29,760
You are correct, David. 
This is another topic you know, 

194
00:11:29,760 --> 00:11:32,840
similarly to what we discussed 
before with SATISFACTORS for 

195
00:11:32,840 --> 00:11:36,080
procurement point of view, we 
have the Total Spend Management,

196
00:11:36,320 --> 00:11:40,480
a single solution made of SAPR, 
Vivo and Figlas, which are also 

197
00:11:40,480 --> 00:11:44,400
complementary platforms working 
together in a productized 

198
00:11:44,400 --> 00:11:48,560
integrated architecture like 
only SAP can offer in short. 

199
00:11:49,040 --> 00:11:53,280
SAP Arriba will manage the 
strategic sourcing that will end

200
00:11:53,280 --> 00:11:56,920
up with the signature of a legal
contract with corresponding 

201
00:11:56,920 --> 00:12:00,240
terms and conditions making it 
available in figures moving them

202
00:12:00,240 --> 00:12:04,120
to the operational process in 
collaboration with supplier for 

203
00:12:04,120 --> 00:12:08,440
them to certify delivered 
services but with business rules

204
00:12:08,560 --> 00:12:12,640
that ensure those pre negotiated
terms in the contracts will be 

205
00:12:12,760 --> 00:12:16,960
respected going through reviews,
approvals, evaluations and 

206
00:12:16,960 --> 00:12:20,440
finalizing the process. 
With the suppliers invoicing and

207
00:12:20,440 --> 00:12:24,200
payment, did I clarify? 
Yeah, yeah, yeah, that makes 

208
00:12:24,200 --> 00:12:25,920
sense. 
So I'm going to try to boil this

209
00:12:25,920 --> 00:12:30,040
down to maybe an over simplistic
overview, just so I can make 

210
00:12:30,040 --> 00:12:34,000
sure I understand. 
So for example, we have SAP 

211
00:12:34,000 --> 00:12:37,120
Arriba which would be on the 
procurement side and basically 

212
00:12:37,160 --> 00:12:42,800
SAP Arriba will manage the high 
level need for the requirement 

213
00:12:42,800 --> 00:12:46,640
of something, the procurement of
a thing, if that need is raised.

214
00:12:46,640 --> 00:12:51,080
An SAP Arriba field glass 
basically takes over a lot of 

215
00:12:51,080 --> 00:12:55,520
the specific detailed nuances of
that particular procurement. 

216
00:12:56,200 --> 00:13:00,880
So field glass basically handles
the region specific details that

217
00:13:00,880 --> 00:13:04,080
are required for the carrying 
out of the procurement of 

218
00:13:04,080 --> 00:13:07,680
something or the procurement of 
contingent workforce for 

219
00:13:07,680 --> 00:13:11,160
example. 
Am I correct or am I off base 

220
00:13:11,160 --> 00:13:14,000
here? 
No, you're correct in short, 

221
00:13:14,120 --> 00:13:16,960
but. 
It's like we will focus with 

222
00:13:16,960 --> 00:13:22,200
figures in the execution of the 
service and all the agreement, 

223
00:13:22,680 --> 00:13:25,720
the source in for example when 
you don't know you have a need 

224
00:13:26,000 --> 00:13:28,800
and you need to hire certain 
service. 

225
00:13:28,880 --> 00:13:33,000
But then you are sending an RFP 
for example to multiple 

226
00:13:33,000 --> 00:13:36,960
suppliers and then analyzing the
best responses and that is 

227
00:13:36,960 --> 00:13:40,600
happening in Ariba. 
So once you selected the right 

228
00:13:40,640 --> 00:13:44,600
supplier to work with. 
Then you will be moving to feel 

229
00:13:44,600 --> 00:13:48,040
less. 
But you may thinking that then I

230
00:13:48,040 --> 00:13:50,640
need to administrate to assist. 
No, there are productize 

231
00:13:50,640 --> 00:13:52,120
integrations between both of 
them. 

232
00:13:52,120 --> 00:13:55,280
She will have a smooth process 
in all these that we are 

233
00:13:55,280 --> 00:13:58,360
discussing. 
OK, so back to Ariba. 

234
00:13:58,880 --> 00:14:01,920
My understanding is that you can
also procure services as well, 

235
00:14:01,920 --> 00:14:03,480
right? 
Yes. 

236
00:14:03,720 --> 00:14:07,200
No, let me let me give some more
description maybe maybe we'll be

237
00:14:07,480 --> 00:14:11,440
clear now. 
You know Ariba can buy services,

238
00:14:11,440 --> 00:14:14,760
yes. 
However, SAP figlasses focuses 

239
00:14:15,000 --> 00:14:17,800
you know, on complex services 
that requires collaboration with

240
00:14:17,800 --> 00:14:21,760
supplier like the maintenance 
programs we discussed before. 

241
00:14:22,400 --> 00:14:26,200
So with a corrective maintenance
for example, you don't know the 

242
00:14:26,200 --> 00:14:30,920
scope in advance, right? 
Then you need a way to support 

243
00:14:30,960 --> 00:14:35,160
the communication with supplier 
to send a work order for them to

244
00:14:35,320 --> 00:14:38,320
analyse the situation and 
recommend the best approach to 

245
00:14:38,320 --> 00:14:41,160
solve. 
Or check in with multiple 

246
00:14:41,160 --> 00:14:45,840
suppliers for example, you know 
there are some services that are

247
00:14:45,840 --> 00:14:49,680
critical. 
For example, in a supply chain 

248
00:14:49,680 --> 00:14:53,320
production on a manufacturer, 
you cannot interrupt that 

249
00:14:53,320 --> 00:14:56,400
production. 
So we need the services to be 

250
00:14:56,400 --> 00:15:00,560
done as quickly as possible. 
And thanks to Figlas, we have 

251
00:15:00,680 --> 00:15:03,720
all the controls over that 
situation Agile Approvals 

252
00:15:03,960 --> 00:15:06,720
Controller for the cost. 
Or applying for example 

253
00:15:06,720 --> 00:15:11,520
penalties because we have an SLA
with a supplier, the KPIs wasn't

254
00:15:11,520 --> 00:15:15,960
met or evaluate the services. 
So you have insights for future 

255
00:15:15,960 --> 00:15:21,000
jobs, references for you to work
with the most talented suppliers

256
00:15:21,000 --> 00:15:24,040
and people. 
Bottom line, you know at the end

257
00:15:24,080 --> 00:15:27,120
is a business definition. 
There are companies that buy 

258
00:15:27,400 --> 00:15:31,920
goods through SAP Arriba and all
services through Figlas for 

259
00:15:31,920 --> 00:15:34,680
example, and there are others 
that classify services. 

260
00:15:35,040 --> 00:15:38,960
Into simple ones like paying 
utilities or rent through Arriba

261
00:15:39,280 --> 00:15:43,040
and others more complex like IT 
software factory construction, 

262
00:15:43,040 --> 00:15:47,800
call centre security cleaning or
the ones we mentioned before 

263
00:15:47,800 --> 00:15:51,280
already, right. 
You know, all this is also part 

264
00:15:51,280 --> 00:15:55,120
of the SAP Intelligent 
Enterprises strategy that I'm 

265
00:15:55,120 --> 00:15:57,880
sure you heard about it. 
All right. 

266
00:15:58,440 --> 00:16:01,000
Thanks for for painting the 
picture and for outlining it in 

267
00:16:01,000 --> 00:16:03,280
a simple manner for even me to 
understand. 

268
00:16:03,280 --> 00:16:06,720
Highly appreciated. 
Moving on to actually learning a

269
00:16:06,720 --> 00:16:09,240
bit more. 
So when you're a beginner out 

270
00:16:09,240 --> 00:16:12,440
there, I I could bring to 
everybody's attention at least 

271
00:16:12,520 --> 00:16:15,920
to go to learning.sab.com and go
into the little search field 

272
00:16:15,920 --> 00:16:19,040
there and you put field glass as
a keyword and you'd find 2 

273
00:16:19,040 --> 00:16:21,680
learning journeys on that. 
So you could check it on that 

274
00:16:21,680 --> 00:16:23,920
one for the contingent workforce
management, so the temporary 

275
00:16:23,920 --> 00:16:26,280
workforce and the other for 
services procurement. 

276
00:16:26,520 --> 00:16:29,000
So those learning journeys are 
out there free for everybody to 

277
00:16:29,000 --> 00:16:33,480
check out, but what are some 
other approaches that somebody 

278
00:16:33,480 --> 00:16:37,120
can take to investigate fill 
glass a bit more? 

279
00:16:38,120 --> 00:16:40,840
We have a lot of information, 
you know, as you mentioned in 

280
00:16:40,840 --> 00:16:46,560
our SAP web page for example to 
our portfolio and there is 

281
00:16:46,560 --> 00:16:49,600
Figlas, there's a lot of 
material, the description of the

282
00:16:49,600 --> 00:16:52,920
solutions like you mentioned, 
the contingent label module, the

283
00:16:52,920 --> 00:16:55,800
service procurement one, there 
are some ebooks. 

284
00:16:56,240 --> 00:17:01,440
Testimonies and also for or 
already SAP customers that for 

285
00:17:01,440 --> 00:17:04,240
sure have access to the SAP Help
portal. 

286
00:17:04,560 --> 00:17:07,960
They will be able to find the 
full library of features, you 

287
00:17:07,960 --> 00:17:12,440
know how to configure things and
also the full set of 

288
00:17:12,480 --> 00:17:16,640
integrations. 
Now if in the audience we have 

289
00:17:16,640 --> 00:17:20,960
employees also we have internal 
material, you know or or Fig 

290
00:17:20,960 --> 00:17:24,240
let's have with very amazing 
content, all right. 

291
00:17:24,240 --> 00:17:27,599
So we'll we'll gather a list of 
links of all these resources and

292
00:17:27,599 --> 00:17:30,960
put it into the show notes for 
this podcast so everybody can go

293
00:17:31,000 --> 00:17:32,760
check them out at their own 
pace. 

294
00:17:33,600 --> 00:17:36,200
Another topic that I like to 
bring up with some folks 

295
00:17:36,200 --> 00:17:38,960
especially those who are talking
about a a particular SAP 

296
00:17:38,960 --> 00:17:41,080
solution. 
These SAP solutions are touching

297
00:17:41,080 --> 00:17:44,720
many business processes and 
they're acting across many 

298
00:17:44,720 --> 00:17:47,440
different industries, different 
sort of companies doing all 

299
00:17:47,440 --> 00:17:50,680
sorts of interesting and unusual
sorts of business. 

300
00:17:51,120 --> 00:17:54,360
And for you, since you're in pre
sales, So what would you say is 

301
00:17:54,360 --> 00:17:59,280
the most unusual case that or 
most unusual application of 

302
00:17:59,280 --> 00:18:02,800
field class that you've seen any
unusual jobs or industries where

303
00:18:02,800 --> 00:18:04,040
you've seen the solution working
in? 

304
00:18:05,440 --> 00:18:09,000
You know remember at the 
beginning I I mentioned you know

305
00:18:09,600 --> 00:18:12,440
I I was originally working on 
the telco business, right and 

306
00:18:12,720 --> 00:18:15,640
and looking for expanding to 
other industries. 

307
00:18:15,640 --> 00:18:19,760
So with Figlas, I indeed find 
that you know. 

308
00:18:20,440 --> 00:18:23,880
I consider myself lucky to work 
with such a variety of use 

309
00:18:23,880 --> 00:18:28,840
cases, travelling all abroad and
just let me let me tell you some

310
00:18:29,040 --> 00:18:33,480
crazy stories, or maybe not that
crazy but the most interesting 

311
00:18:33,480 --> 00:18:36,560
ones you know, I think the first
one was in in Chile. 

312
00:18:36,960 --> 00:18:40,440
I travelled to Santiago for for 
supporting an event and from 

313
00:18:40,440 --> 00:18:43,640
there we travelled to the South 
cone in Chile. 

314
00:18:43,640 --> 00:18:49,240
I can't remember well, but it 
was near Puerto Mond for a 

315
00:18:49,240 --> 00:18:51,720
meeting with a customer. 
That produce salmons. 

316
00:18:52,680 --> 00:18:56,800
So I needed to demonstrate how 
SAP figlas can help them 

317
00:18:56,960 --> 00:19:01,280
managing all this service 
contract for feeding and growing

318
00:19:01,280 --> 00:19:03,640
salmons in the middle of the 
Pacific Ocean. 

319
00:19:03,880 --> 00:19:08,120
So I'm an electronic engineer. 
So what do I know about you know

320
00:19:08,120 --> 00:19:12,560
fishes not much. 
So I started investigating as a 

321
00:19:12,560 --> 00:19:15,440
good engineer. 
I did my research, I prepared 

322
00:19:15,440 --> 00:19:19,400
for it and then I did that 
amazing presentation that and 

323
00:19:19,400 --> 00:19:22,920
that convincing the the, the 
customer that we can help them. 

324
00:19:23,320 --> 00:19:27,680
Let me tell you another one, 
this time in in Mexico, very 

325
00:19:27,680 --> 00:19:32,480
exciting opportunity where we 
model a solution and thanks you 

326
00:19:32,480 --> 00:19:35,160
know to the flexibility SAP 
Figless offers. 

327
00:19:35,640 --> 00:19:39,080
We managed to create something 
for administrating artists, 

328
00:19:39,240 --> 00:19:44,200
singers, rock bands, dancers. 
Imagine that scenario was quite 

329
00:19:44,200 --> 00:19:49,240
fantastic and we supported 
through finlas, the production 

330
00:19:49,240 --> 00:19:54,160
of concerts, festivals, shows. 
You know this is the biggest 

331
00:19:54,160 --> 00:19:58,480
company in entertainment 
industry there in in Mexico. 

332
00:19:59,200 --> 00:20:02,520
I work also on very complex 
solutions and architectures in 

333
00:20:02,600 --> 00:20:06,040
oil and gas companies with. 
Platforms in the oceans. 

334
00:20:06,120 --> 00:20:09,280
I wanted to travel, you know in 
helicopter to those platforms. 

335
00:20:09,480 --> 00:20:13,320
Very exciting. 
Or recently for example, I work 

336
00:20:13,320 --> 00:20:17,440
with a mining company and I had 
them achieve their goals like 

337
00:20:17,440 --> 00:20:21,400
for example health and safety 
controls, reducing accidents. 

338
00:20:21,800 --> 00:20:25,600
This is very serious for this 
type of industries or getting 

339
00:20:25,600 --> 00:20:29,360
considerable savings. 
OK, that sounds like a very 

340
00:20:29,600 --> 00:20:33,360
diverse set of experiences. 
Just sort of on a professional 

341
00:20:33,360 --> 00:20:37,760
level of or out of for my own 
curiosity, what level of 

342
00:20:37,760 --> 00:20:41,080
understanding of these 
particular processes do you need

343
00:20:41,080 --> 00:20:45,200
to achieve before being able to 
convince a customer that this 

344
00:20:45,200 --> 00:20:47,640
solution fits to them? 
So how deeply do you need to get

345
00:20:47,640 --> 00:20:50,120
into the topic and how long do 
you have to prepare and research

346
00:20:50,400 --> 00:20:54,320
for such a scenario? 
Well, this is interesting, you 

347
00:20:54,320 --> 00:20:56,400
know. 
You always need to keep your 

348
00:20:56,400 --> 00:21:00,200
mind open, you know because I 
like to say that Phyllis is like

349
00:21:00,560 --> 00:21:04,520
one in a kind of solution. 
You need to think on the 

350
00:21:04,520 --> 00:21:08,680
industry on the specific use 
case and and what what are the 

351
00:21:08,680 --> 00:21:12,200
problematic you know what are 
the the issues that the customer

352
00:21:12,200 --> 00:21:15,360
have that you can resolve. 
So you need to be always you 

353
00:21:15,360 --> 00:21:19,600
know, open minded, do some 
investigation talk in the 

354
00:21:19,680 --> 00:21:23,400
customer's language, right, 
depending on the industry then 

355
00:21:23,400 --> 00:21:27,240
you have to learn about our new 
words, new things. 

356
00:21:27,800 --> 00:21:30,680
So it's always a learning path, 
but you know the main 

357
00:21:31,080 --> 00:21:34,040
foundational process that you 
need to know is, is about 

358
00:21:34,040 --> 00:21:36,960
services. 
Everything that is related to 

359
00:21:36,960 --> 00:21:41,400
that, you know you have from one
way the operational control, the

360
00:21:41,400 --> 00:21:45,440
service execution itself, right.
But you have also other 

361
00:21:45,440 --> 00:21:47,800
controls, the onboarding of 
boarding of the people. 

362
00:21:47,800 --> 00:21:51,000
So you have an HR human touch 
there too. 

363
00:21:51,520 --> 00:21:54,480
And there's another process like
for example the obligations that

364
00:21:54,480 --> 00:21:58,000
the supplier has on that 
particular service. 

365
00:21:58,400 --> 00:22:01,880
So there is a lot to consider. 
It's, it's, I think it's, it's 

366
00:22:02,000 --> 00:22:04,200
very exciting. 
I like working in figures. 

367
00:22:04,920 --> 00:22:07,360
Very cool. 
So anybody interested in 

368
00:22:07,840 --> 00:22:10,600
understanding particular service
processes across many 

369
00:22:10,600 --> 00:22:12,440
industries, this might be the 
job for them. 

370
00:22:12,920 --> 00:22:15,440
But Sebastian, we've we've taken
a lot of your time. 

371
00:22:15,720 --> 00:22:19,080
So I think we're coming to a 
close now and as we come to a 

372
00:22:19,080 --> 00:22:22,520
close, I always want to. 
Collect our experts words of 

373
00:22:22,520 --> 00:22:25,880
wisdoms for our learners. 
Do you have any for us today? 

374
00:22:26,520 --> 00:22:32,120
OK, now SAP figures is here to 
meet the the business needs 

375
00:22:32,120 --> 00:22:34,920
around the subcontractor 
services and external workforce.

376
00:22:35,280 --> 00:22:39,800
That represents a lot of money. 
You know between 50 to 80% of 

377
00:22:39,800 --> 00:22:41,960
the total company spend goes to 
service. 

378
00:22:41,960 --> 00:22:46,440
Typically that push companies 
for better controls making it a 

379
00:22:46,440 --> 00:22:49,000
top priority. 
And with the digital 

380
00:22:49,000 --> 00:22:52,440
transformation, we basically 
have a great chance to extend 

381
00:22:52,440 --> 00:22:55,680
the internal processes to the 
external ones and making them 

382
00:22:55,680 --> 00:22:59,040
more efficient, which can result
in important benefits. 

383
00:22:59,320 --> 00:23:01,400
We discussed some already, 
right? 

384
00:23:01,920 --> 00:23:06,760
Plus considering that every 
company has subcontracted 

385
00:23:06,760 --> 00:23:10,560
services, some more than others.
According for example to 

386
00:23:10,560 --> 00:23:14,880
McKenzie, the trend of the 
future of work is that one of 

387
00:23:14,880 --> 00:23:18,320
two workers will be external. 
There will be a battle for 

388
00:23:18,320 --> 00:23:20,880
talent that we can see happening
already, right? 

389
00:23:20,880 --> 00:23:24,720
I mean it's very hard to get 
specialist people and those 

390
00:23:24,720 --> 00:23:29,440
companies that are best prepared
will have a better competitive 

391
00:23:29,440 --> 00:23:33,480
advantage accessing to a talent 
pool of pre qualified service 

392
00:23:33,760 --> 00:23:38,440
suppliers and workers. 
Companies need a solution like 

393
00:23:38,480 --> 00:23:42,720
SAP figures for the reasons we 
discussed today, cost savings, 

394
00:23:42,720 --> 00:23:46,840
compliance and risk management, 
visibility, collaboration, 

395
00:23:46,840 --> 00:23:49,080
etcetera. 
And we are here to help you 

396
00:23:49,760 --> 00:23:53,360
either if you are a customer 
that wants to run some 

397
00:23:53,360 --> 00:23:56,040
evaluations or an employee that 
wants to know more. 

398
00:23:56,760 --> 00:23:59,560
All right. 
With that, SAP Field class is 

399
00:23:59,560 --> 00:24:01,640
the future. 
Thank you, Sir for your time and

400
00:24:01,640 --> 00:24:03,440
expertise and thanks for being 
on the show. 

401
00:24:04,080 --> 00:24:07,480
Thank thank to you David for 
this opportunity. 

402
00:24:07,560 --> 00:24:11,200
I'm looking forward for 
recording our next episode. 

403
00:24:11,760 --> 00:24:13,640
Great. 
Thanks for listening everybody.