You can never succeed in supply 
chain without continuous 

2
00:00:05,040 --> 00:00:07,320
improvement. 
If you're not changing things, 

3
00:00:07,320 --> 00:00:10,160
if you're not thinking about 
change, you're in the wrong 

4
00:00:10,160 --> 00:00:13,720
business. 
Uncertainty will always be there

5
00:00:13,880 --> 00:00:16,520
for supply chains. 
How do we build robustness? 

6
00:00:16,960 --> 00:00:20,080
And that itself changes over 
time. 

7
00:00:20,640 --> 00:00:23,360
I'll give you an example. 
We are living in very 

8
00:00:23,360 --> 00:00:27,040
interesting political times 
globally that will have an 

9
00:00:27,040 --> 00:00:31,160
impact to businesses worldwide. 
So how do we prepare for that? 

10
00:00:31,280 --> 00:00:34,680
A lot is in the line for sure, 
but how do we prepare for that? 

11
00:00:34,680 --> 00:00:38,480
And that is to be robustness and
continuous improvement. 

12
00:00:39,880 --> 00:00:42,960
Hello, I'm Richard Howells and 
this is the Future of Supply 

13
00:00:42,960 --> 00:00:46,040
Chain, a podcast where we 
discuss hot topics, best 

14
00:00:46,040 --> 00:00:48,520
practices and the latest 
innovations in today's global 

15
00:00:48,520 --> 00:00:50,680
supply chain. 
And today, we're going to be 

16
00:00:50,680 --> 00:00:53,800
discussing network aware 
planning and what makes it 

17
00:00:53,800 --> 00:00:56,960
better than traditional planning
and delivering value to supply 

18
00:00:56,960 --> 00:00:59,400
chain executives. 
And to do so, I have a great 

19
00:00:59,400 --> 00:01:01,720
guest, Weston actors, Alexis 
Lozada. 

20
00:01:02,640 --> 00:01:06,320
So Alexis, welcome and please if
you could introduce yourself, 

21
00:01:06,520 --> 00:01:09,000
give a little bit of insight 
about your company and what you 

22
00:01:09,000 --> 00:01:10,800
do with the company. 
Yeah. 

23
00:01:10,800 --> 00:01:12,840
Well, thank you, Richard. 
Thank you very much for this 

24
00:01:12,840 --> 00:01:15,760
opportunity to talk about this 
very relevant topic. 

25
00:01:16,200 --> 00:01:19,160
So Alexis Lozada, I'm the 
practice Director for Supply 

26
00:01:19,160 --> 00:01:21,280
Chain Planning at Western Actor 
Consulting. 

27
00:01:21,920 --> 00:01:25,280
Western Actor Consulting, it's a
global consulting firm 

28
00:01:25,320 --> 00:01:30,080
specialize in SAP products. 
We are an SAP partner. 

29
00:01:30,400 --> 00:01:33,840
We have a global presence and we
are very much focused on the 

30
00:01:33,840 --> 00:01:37,320
areas of digital core and supply
chain management. 

31
00:01:38,000 --> 00:01:42,480
We are end to end integrators 
from the digital core, the ERP's

32
00:01:42,520 --> 00:01:47,040
of this world, to planning all 
the way to execution of supply 

33
00:01:47,040 --> 00:01:50,240
chain processes. 
We are global, we follow the 

34
00:01:50,240 --> 00:01:53,200
sun. 
We are mostly in the major 

35
00:01:53,200 --> 00:01:56,440
continents where there are 
industries and businesses. 

36
00:01:56,880 --> 00:02:01,000
We speak multiple languages and 
I have the privilege to lead the

37
00:02:01,000 --> 00:02:02,480
practice. 
There's a bunch of blaming 

38
00:02:02,520 --> 00:02:05,160
practice for the Americas, 
mainly focused on the United 

39
00:02:05,160 --> 00:02:08,440
States and Canada, supporting 
also our business in Latin 

40
00:02:08,440 --> 00:02:10,840
America. 
Sounds like we've got the right 

41
00:02:10,840 --> 00:02:13,640
person on the podcast to have 
this discussion, so welcome. 

42
00:02:14,520 --> 00:02:16,720
Thank you. 
I just want to get some 

43
00:02:16,720 --> 00:02:19,200
definitions out there. 
To start with, we're going to be

44
00:02:19,200 --> 00:02:22,080
talking about network aware 
planning and most people know 

45
00:02:22,080 --> 00:02:24,760
supply chain planning, but 
network aware planning might be 

46
00:02:24,760 --> 00:02:27,600
a new term to them. 
So what do you mean when you say

47
00:02:27,600 --> 00:02:30,760
network aware planning and why 
is it important in today's 

48
00:02:30,760 --> 00:02:32,640
environment? 
Yeah. 

49
00:02:32,640 --> 00:02:35,280
So it's about connectivity. 
So when you think about 

50
00:02:35,280 --> 00:02:39,920
connectivity is the process 
connectivity, is the material 

51
00:02:39,920 --> 00:02:43,160
flow connectivity, the 
information flow connectivity, 

52
00:02:43,240 --> 00:02:45,000
and of course, the money flow 
connectivity. 

53
00:02:45,640 --> 00:02:50,320
So let me go beyond just that. 
If I'm a person today making 

54
00:02:50,360 --> 00:02:56,000
planning decisions, whether is a
demand signal or an inventory or

55
00:02:56,000 --> 00:02:59,600
a supply deployment, I need to 
be aware the consequences of 

56
00:02:59,600 --> 00:03:03,680
those decisions downstream to my
business, but also upstream to 

57
00:03:03,680 --> 00:03:06,000
my business. 
When we talked about supply 

58
00:03:06,000 --> 00:03:10,440
chains, right, they're basically
a design flow, a flow that goes 

59
00:03:10,440 --> 00:03:15,080
from upstream and all the way 
downstream, upstream coming from

60
00:03:15,280 --> 00:03:18,320
either the transformation of raw
materials, right, or the 

61
00:03:18,320 --> 00:03:21,800
sourcing of raw materials going 
downstream to a production 

62
00:03:21,800 --> 00:03:25,240
process going downstream to a 
distribution, making it to the 

63
00:03:25,240 --> 00:03:28,760
final customer, right? 
When I say downstream and 

64
00:03:28,760 --> 00:03:30,120
upstream, that's what I'm 
referring to. 

65
00:03:30,880 --> 00:03:35,160
Network aware is about making 
decisions that we are aware of 

66
00:03:35,160 --> 00:03:37,480
the impact that it has 
downstream and upstream for 

67
00:03:37,480 --> 00:03:41,800
where we are in the supply chain
coming from all of our vendors, 

68
00:03:41,800 --> 00:03:44,920
suppliers, going through our 
whole network of value 

69
00:03:44,920 --> 00:03:49,080
transformation and be able to 
flow naturally into my customers

70
00:03:49,160 --> 00:03:52,560
at the lowest cost possible, at 
the most effective asset 

71
00:03:52,560 --> 00:03:56,160
utilization and I'm able to 
achieve my business goals. 

72
00:03:57,240 --> 00:04:00,360
It's interesting, I've worked in
supply chain for 30 plus years 

73
00:04:00,360 --> 00:04:03,520
now and you can never use it of 
being boring. 

74
00:04:03,800 --> 00:04:05,720
Because there. 
Is always a disruption, but you 

75
00:04:05,720 --> 00:04:08,440
don't know what the disruption 
is, as you perfectly described. 

76
00:04:09,040 --> 00:04:14,040
With that in mind, whether it's 
a port closure or global 

77
00:04:14,040 --> 00:04:18,079
pandemic or tariffs on borders, 
whatever the next disruption may

78
00:04:18,079 --> 00:04:22,760
be, how does Network Aware 
planning help address this 

79
00:04:22,760 --> 00:04:26,640
disruption and these challenges?
Network aware planning now 

80
00:04:26,640 --> 00:04:29,320
allows you to think about the 
different networks that are 

81
00:04:29,320 --> 00:04:32,680
within your supply chain. 
There is the end to end supply 

82
00:04:32,680 --> 00:04:35,440
chain network and we've heard 
this term for a very long time, 

83
00:04:35,440 --> 00:04:38,120
right, more than 10 years. 
But if you think about it, these

84
00:04:38,120 --> 00:04:42,280
are networks of networks. 
And again, I go back to as a 

85
00:04:42,280 --> 00:04:45,840
planner or as a supply chain 
manager, whoever is the supply 

86
00:04:45,840 --> 00:04:48,280
chain lead, you have to know 
where you are. 

87
00:04:48,560 --> 00:04:52,200
So I'm an avid soccer player. 
You need to know whether you are

88
00:04:52,400 --> 00:04:56,040
a holder or striker or a 
midfielder or even a goalie, 

89
00:04:56,360 --> 00:05:00,480
knowing your position is knowing
how are you going to manage that

90
00:05:00,480 --> 00:05:02,800
network right, that network 
game. 

91
00:05:03,000 --> 00:05:05,600
To put it in tougher terms, 
let's say I'm a goalie. 

92
00:05:05,600 --> 00:05:08,120
I'm in the back. 
I'm managing the networks of 

93
00:05:08,120 --> 00:05:12,240
suppliers and vendors, right? 
Being network aware is that if 

94
00:05:12,240 --> 00:05:15,920
I'm going to build robustness 
and I'm part of the supplier 

95
00:05:15,920 --> 00:05:19,600
networks or the vendor networks,
I need to understand what are 

96
00:05:19,600 --> 00:05:23,680
the variables that are going to 
impact not only the sourcing of 

97
00:05:23,680 --> 00:05:26,680
materials coming to my supply 
chain, but also my vendors 

98
00:05:26,680 --> 00:05:30,960
themselves. 
Knowing the drivers of that 

99
00:05:30,960 --> 00:05:33,040
supply chain, of that vendor 
network. 

100
00:05:33,040 --> 00:05:36,560
Supply chain is very important 
and I can give you examples, 

101
00:05:36,800 --> 00:05:40,080
points of sourcing, lead times 
and variability. 

102
00:05:40,560 --> 00:05:45,480
Do I have the flexibility to 
change sources or do I have 

103
00:05:45,480 --> 00:05:48,840
friction in the sourcing? 
And now that you have that 

104
00:05:48,920 --> 00:05:52,440
vendor network awareness, now 
you can start making strategic 

105
00:05:52,440 --> 00:05:55,280
decisions how to face potential 
disruptions. 

106
00:05:55,720 --> 00:05:59,080
Scenarios are going to be a 
thousands, but what is important

107
00:05:59,080 --> 00:06:02,640
the key aspect of being network 
aware in this case is that you 

108
00:06:02,640 --> 00:06:04,880
know the main drivers of that 
network. 

109
00:06:05,600 --> 00:06:10,160
And when you learn about those 
main drivers then you can start 

110
00:06:10,200 --> 00:06:14,200
running scenarios to measure the
impact to your supply chain and 

111
00:06:14,200 --> 00:06:19,200
to your vendors supply chain. 
That is where the benefit of 

112
00:06:19,200 --> 00:06:22,760
being network aware. 
For example, first of. 

113
00:06:22,760 --> 00:06:25,760
All, thank you for giving a 
soccer example because you're 

114
00:06:25,760 --> 00:06:28,520
speaking my language with soccer
and supply chain. 

115
00:06:28,520 --> 00:06:30,720
Planning it's like. 
My two favorite things coming. 

116
00:06:30,720 --> 00:06:33,920
Together in one. 
So when you talk about this 

117
00:06:33,920 --> 00:06:37,640
visibility and this 
collaboration and having access 

118
00:06:37,640 --> 00:06:41,000
to the data to make these 
decisions to minimize the risks,

119
00:06:41,600 --> 00:06:44,880
what are some of the strategies,
the techniques and the best 

120
00:06:44,880 --> 00:06:48,800
practices that you're seeing put
into use across your customer 

121
00:06:48,800 --> 00:06:52,360
base? 
So today's technology provide 

122
00:06:52,360 --> 00:06:56,600
that visibility, the fastness, 
access to the data, the 

123
00:06:56,600 --> 00:07:00,000
processing of the data and 
really running the scenarios 

124
00:07:00,000 --> 00:07:04,040
that you need. 
Today's technology are very much

125
00:07:04,040 --> 00:07:07,200
in line with the concept of 
network aware planning. 

126
00:07:07,280 --> 00:07:12,760
In this case, what is known 
there is the data, the 

127
00:07:12,760 --> 00:07:15,560
trustworthiness of the data. 
This is another problem that 

128
00:07:15,600 --> 00:07:19,440
hasn't gone away. 
But the other aspect of this is 

129
00:07:19,480 --> 00:07:23,480
the people and the processes. 
If you measure the two 

130
00:07:23,480 --> 00:07:26,480
challenges, every supply chain 
leader out there will tell you, 

131
00:07:26,480 --> 00:07:29,760
well, yeah, the technology is 
wonderful, but I don't trust the

132
00:07:29,760 --> 00:07:31,800
data, right. 
So everything is turns into a 

133
00:07:31,800 --> 00:07:34,240
cleansing. 
Master data governance, because 

134
00:07:34,240 --> 00:07:37,880
a lot of companies don't have 
the data, let's call it rigor, 

135
00:07:38,040 --> 00:07:41,520
discipline, data management, 
master data management, what 

136
00:07:41,520 --> 00:07:43,280
have you. 
That is a problem that is 

137
00:07:43,280 --> 00:07:45,640
actually today. 
And I will say technology is 

138
00:07:45,640 --> 00:07:49,640
also very helpful in getting you
into the right data and being 

139
00:07:49,640 --> 00:07:52,200
trustworthy of the data. 
I don't think that's a major 

140
00:07:52,200 --> 00:07:54,800
obstacle to be honest. 
One of the major obstacles that 

141
00:07:54,800 --> 00:07:58,720
I'm seeing time after time is 
that the processes are non 

142
00:07:58,720 --> 00:08:02,200
network based. 
People are trained to make 

143
00:08:02,200 --> 00:08:06,440
deterministic decisions and very
narrow decisions. 

144
00:08:07,000 --> 00:08:10,400
People more than ever. 
It's like decisions are based on

145
00:08:10,400 --> 00:08:15,800
laser focus, very narrow, very 
few variables, very small sets 

146
00:08:15,800 --> 00:08:18,480
of data. 
Give it to me very simplified is

147
00:08:18,480 --> 00:08:21,760
not the proper way we need to 
retrain or train the new 

148
00:08:21,760 --> 00:08:25,080
generation of planners to be 
network aware. 

149
00:08:25,240 --> 00:08:28,040
Going back to what are the 
variables right? 

150
00:08:28,280 --> 00:08:32,200
And it's a network both across 
your organization into cross 

151
00:08:32,200 --> 00:08:35,120
multiple departments within your
organization, Yeah, and the 

152
00:08:35,440 --> 00:08:37,960
larger network, your supply 
chain network. 

153
00:08:38,159 --> 00:08:40,799
That is correct. 
So we're very good at setting up

154
00:08:40,799 --> 00:08:44,120
supply chains that consume raw 
materials and transform into 

155
00:08:44,120 --> 00:08:45,720
products and we ship them, 
right. 

156
00:08:45,960 --> 00:08:48,920
But we're not good. 
It's train people to understand 

157
00:08:48,920 --> 00:08:52,440
that flow. 
We don't take people to see the 

158
00:08:52,440 --> 00:08:55,120
world the way the supply chain 
works. 

159
00:08:55,680 --> 00:08:58,240
I'm not going to be trained that
way if everything's going 

160
00:08:58,240 --> 00:09:01,960
according to plan, but as we 
know, things don't go according 

161
00:09:01,960 --> 00:09:03,240
to plan. 
Correct. 

162
00:09:03,240 --> 00:09:05,160
Stuff happens. 
You bring a very good point, 

163
00:09:05,160 --> 00:09:07,840
Richard, because this is the 
difference between somebody who 

164
00:09:07,840 --> 00:09:10,720
is looking at the supply chain 
very narrowly and something 

165
00:09:10,720 --> 00:09:14,120
breaks is going to come with a 
very limited solution. 

166
00:09:14,640 --> 00:09:18,360
And in fact, most frequently 
those solutions are actually 

167
00:09:18,360 --> 00:09:20,440
pushing costs downstream or 
upstream. 

168
00:09:21,000 --> 00:09:24,360
Many years ago when I worked for
a consumer goods company, I 

169
00:09:24,360 --> 00:09:27,520
remember working with pure men 
and they were claiming millions 

170
00:09:27,520 --> 00:09:30,720
of dollars of savings because 
they negotiated this price deal 

171
00:09:31,080 --> 00:09:33,320
and secured this supply with a 
vendor. 

172
00:09:33,920 --> 00:09:36,160
Well, the good news that I 
brought to the procurement guy 

173
00:09:36,160 --> 00:09:38,920
was like, well, congratulations,
but actually you didn't save 

174
00:09:38,920 --> 00:09:43,040
that much money because all that
transactional saving, now the 

175
00:09:43,040 --> 00:09:45,400
plan doesn't have a location to 
put it. 

176
00:09:45,800 --> 00:09:48,280
We have to hire overflow 
warehouses. 

177
00:09:48,720 --> 00:09:51,440
And by the way, a lot of that is
going to get damaged or go 

178
00:09:51,440 --> 00:09:53,760
obsolete. 
So they optimize the procurement

179
00:09:53,760 --> 00:09:55,720
process, but at the detriment of
other things. 

180
00:09:55,920 --> 00:09:58,720
Exactly. 
So if that is the quintessential

181
00:09:58,720 --> 00:10:02,440
example of no being network 
aware, right, If there was 

182
00:10:02,440 --> 00:10:05,920
network awareness for the 
procurement team, there would 

183
00:10:05,920 --> 00:10:09,400
have been a strategic decision 
to yes, negotiate price, but 

184
00:10:09,400 --> 00:10:14,920
negotiate price for the quantity
that was in line closest to 

185
00:10:14,920 --> 00:10:17,640
capacity. 
And so that is a clear example 

186
00:10:17,640 --> 00:10:21,360
of the challenges that I see. 
If we had a process and we have 

187
00:10:21,360 --> 00:10:24,280
people trained to look at this 
end to end process for their 

188
00:10:24,280 --> 00:10:26,600
corresponding networks, decision
would have been a. 

189
00:10:26,600 --> 00:10:30,640
Different within the planning 
process itself, are you seeing 

190
00:10:30,640 --> 00:10:35,560
companies taking advantage of 
simulations and what if analysis

191
00:10:35,880 --> 00:10:39,960
to manage risks or to predict 
risks in the future? 

192
00:10:40,960 --> 00:10:44,520
Yes, I am. 
Once you train a customer to be 

193
00:10:44,520 --> 00:10:48,240
network aware, which means 
knowing the comprehensive 

194
00:10:48,240 --> 00:10:52,200
variables that impact my 
decision, that is the aha moment

195
00:10:52,680 --> 00:10:55,720
when they're going to trigger a 
scenario simulations. 

196
00:10:56,080 --> 00:11:00,480
Because the next phase of that 
is I would like to run all of 

197
00:11:00,480 --> 00:11:03,960
this possible scenarios with all
these variables to understand 

198
00:11:03,960 --> 00:11:07,640
which ones are the ones that I 
need to care about because not 

199
00:11:07,640 --> 00:11:10,960
every variable is created equal 
for every supply chain. 

200
00:11:11,400 --> 00:11:15,240
So the important part, and this 
is when we are capable of 

201
00:11:15,440 --> 00:11:18,320
processing and consuming all of 
this is a learning process to 

202
00:11:18,320 --> 00:11:22,640
begin with is to say, OK, now 
that I understand that these are

203
00:11:22,640 --> 00:11:26,360
all the variables that can have 
an impact to my decision, let me

204
00:11:26,360 --> 00:11:28,440
run the scenarios. 
Let me run sensitivities. 

205
00:11:28,720 --> 00:11:32,160
So now I know that out of the 
10, for example, these three are

206
00:11:32,160 --> 00:11:34,400
the most relevant and these 
three are the ones that I need 

207
00:11:34,400 --> 00:11:37,920
to keep monitoring changes 
because these ones are really 

208
00:11:37,920 --> 00:11:41,680
going to impact the business. 
You mentioned a little earlier 

209
00:11:41,680 --> 00:11:44,320
the supply chain process and the
upstream and downstream and all 

210
00:11:44,320 --> 00:11:46,040
the different nodes in that 
supply chain. 

211
00:11:46,360 --> 00:11:50,560
And I would imagine a network 
aware planning process would 

212
00:11:50,560 --> 00:11:54,400
have tools to position inventory
in the right places and drive 

213
00:11:54,400 --> 00:11:57,160
inventory optimization because 
it's not always a case of 

214
00:11:57,160 --> 00:11:59,080
carrying more inventory is the 
right answer. 

215
00:11:59,080 --> 00:12:01,080
It's having the right in between
the right place. 

216
00:12:01,320 --> 00:12:03,400
Do you have any examples of that
that you've seen? 

217
00:12:04,360 --> 00:12:06,840
Yeah. 
So I specialize for the last 

218
00:12:07,240 --> 00:12:10,680
eight years in the inventory 
planning based on optimization. 

219
00:12:11,200 --> 00:12:13,480
Let's give you an example 
network of word planning, right.

220
00:12:13,480 --> 00:12:16,120
So in order to allocate 
inventory, first thing that you 

221
00:12:16,120 --> 00:12:19,360
need to know is your demand and 
the demand variability. 

222
00:12:19,800 --> 00:12:22,280
How big is my demand? 
How big is my demand 

223
00:12:22,280 --> 00:12:24,760
variability? 
And then what is that service 

224
00:12:24,760 --> 00:12:28,240
level that I want to meet that 
demand at that variability? 

225
00:12:28,520 --> 00:12:31,080
That is the number one variable 
that you see. 

226
00:12:31,280 --> 00:12:34,360
You see that when you make 
inventory decisions, you have to

227
00:12:34,360 --> 00:12:37,760
be aligned to the demand and the
variability of that demand along

228
00:12:37,760 --> 00:12:40,280
with the target that you want to
accomplish, right? 

229
00:12:40,280 --> 00:12:42,520
The service level target you 
want to accomplish to your 

230
00:12:42,520 --> 00:12:45,800
customer. 
That's phase number one step #2 

231
00:12:45,800 --> 00:12:48,200
is understanding your supply 
network. 

232
00:12:48,680 --> 00:12:52,440
Your splint network is really 
about your capacity to produce 

233
00:12:52,600 --> 00:12:56,520
the lot sizes and the sourcing 
relationships of that lot size, 

234
00:12:56,520 --> 00:12:59,720
meaning transportation lead 
times, transportation 

235
00:12:59,720 --> 00:13:02,480
variability, production lead 
times, production variability. 

236
00:13:02,480 --> 00:13:06,000
And the same thing goes with the
vendor that sourcing comes 

237
00:13:06,000 --> 00:13:08,160
along. 
And why is that relevant? 

238
00:13:08,440 --> 00:13:11,920
Because if your sourcing is 
bigger than your, how much 

239
00:13:11,920 --> 00:13:14,160
allocation of inventory do you 
really need to know? 

240
00:13:14,240 --> 00:13:17,600
Not that much. 
You're always going to be on an 

241
00:13:17,680 --> 00:13:20,960
excess inventory position in an 
extreme example. 

242
00:13:21,080 --> 00:13:23,800
I'm trying to simplify this 
because this is a topic that get

243
00:13:23,800 --> 00:13:27,080
very complicated. 
But in simple terms, if your 

244
00:13:27,200 --> 00:13:30,320
sources supply networks are 
producing more than your demand,

245
00:13:30,640 --> 00:13:32,320
you can care less about the 
member ability. 

246
00:13:32,320 --> 00:13:34,680
Then the decision becomes 
different because it's all about

247
00:13:34,680 --> 00:13:39,040
where do I need to source that 
supply at that point. 

248
00:13:39,040 --> 00:13:42,400
That's where inventory landing 
engines of today help you more 

249
00:13:42,400 --> 00:13:44,720
than ever. 
But then again, that's the clear

250
00:13:44,720 --> 00:13:47,320
example of understanding that 
network awareness. 

251
00:13:47,320 --> 00:13:49,840
If you don't understand the 
magnitude of your demand versus 

252
00:13:49,840 --> 00:13:52,720
your supply, you can be in a 
very eternal losing game. 

253
00:13:53,240 --> 00:13:55,400
And you're back to the 
importance of accurate data then

254
00:13:55,400 --> 00:13:56,840
as well. 
If you don't have the accurate 

255
00:13:56,840 --> 00:13:58,360
data, you're going to make the 
wrong decisions. 

256
00:13:58,800 --> 00:14:00,480
Correct. 
Let's attach that to the 

257
00:14:00,480 --> 00:14:02,720
simulation for a moment, or at 
least scenario planning. 

258
00:14:03,160 --> 00:14:06,760
Then the second thing is, OK, 
why do I have a supply chain 

259
00:14:06,840 --> 00:14:09,520
that is supplying more than I 
need? 

260
00:14:09,920 --> 00:14:11,960
How much do I really need, 
right. 

261
00:14:11,960 --> 00:14:14,440
So these are when you start 
talking about variables like 

262
00:14:14,640 --> 00:14:18,880
economic order quantities, what 
are my effective sizes of that 

263
00:14:18,880 --> 00:14:23,440
lot size and is easier said than
done because there are 

264
00:14:23,440 --> 00:14:26,960
manufacturing processes, 
contractual agreements that are 

265
00:14:26,960 --> 00:14:30,160
not as flexible as we may think.
The topical flexible 

266
00:14:30,160 --> 00:14:33,080
manufacturing is not applicable 
to every industry. 

267
00:14:33,080 --> 00:14:35,920
So it becomes more, if your 
manufacturing is not flexible, 

268
00:14:35,920 --> 00:14:40,240
then what should become flexible
is perhaps what you buy, how 

269
00:14:40,240 --> 00:14:44,080
much you buy in terms of raw 
materials, for example. 

270
00:14:44,680 --> 00:14:47,840
Again, this is what the scenario
kicks in because now the 

271
00:14:47,840 --> 00:14:51,800
technology of today allows you 
to run the scenarios to be able 

272
00:14:51,800 --> 00:14:54,960
to really understand, OK, well, 
this isn't my effective economic

273
00:14:54,960 --> 00:14:59,000
order quantity that I need to 
use within flow within my supply

274
00:14:59,000 --> 00:15:02,440
chain to really meet that demand
and to really streamline my 

275
00:15:02,440 --> 00:15:07,240
inventory positions. 
It is very often that people 

276
00:15:07,240 --> 00:15:11,480
complain about not having enough
safety stock when biggest 

277
00:15:11,480 --> 00:15:15,440
surprise is you don't need 
safety stock because you have so

278
00:15:15,440 --> 00:15:19,360
much flow of supply, you don't 
have to worry about the 

279
00:15:19,360 --> 00:15:22,000
uncertainties of meeting that 
demand. 

280
00:15:22,040 --> 00:15:25,680
Your decision right now is 
allocation really where to 

281
00:15:25,680 --> 00:15:28,920
effectively allocate that supply
to the demand and that's where 

282
00:15:28,920 --> 00:15:30,760
they can help you. 
But then it becomes the other 

283
00:15:30,760 --> 00:15:34,880
question is, OK, well, how can I
trim the quantity of supply, 

284
00:15:34,880 --> 00:15:37,000
right? 
There's some very, very 

285
00:15:37,040 --> 00:15:39,600
relatively talk in simple terms.
But if you think about it, these

286
00:15:39,600 --> 00:15:42,600
are billions of dollars 
decisions sometimes and that's 

287
00:15:42,600 --> 00:15:44,480
why it's worthwhile taking a 
look into it. 

288
00:15:44,880 --> 00:15:48,240
But you see how powerful it is 
to have the technology of today 

289
00:15:48,240 --> 00:15:50,920
supporting us in error planning.
I think we've. 

290
00:15:50,920 --> 00:15:54,640
Covered a lot of the benefits 
already in your answer, but 

291
00:15:54,640 --> 00:15:57,480
maybe I'll give you another 
chance to add anything that you 

292
00:15:57,480 --> 00:15:59,880
may have missed about some of 
the benefits you're seeing from 

293
00:15:59,880 --> 00:16:01,400
leveraging some of these 
approaches. 

294
00:16:02,480 --> 00:16:07,000
That the biggest benefits right 
now is that we can talk about 

295
00:16:07,000 --> 00:16:09,920
like all the financials. 
I will be overdoing it if I 

296
00:16:09,920 --> 00:16:12,640
continue to talk about the 
supply chain performance 

297
00:16:12,640 --> 00:16:15,240
benefits, the financial benefits
of this. 

298
00:16:15,240 --> 00:16:19,440
All of this is going to lead you
to effective network aware based

299
00:16:19,440 --> 00:16:23,160
planning, will lead you to 
sustain or increase service 

300
00:16:23,160 --> 00:16:27,200
levels, increase your asset 
utilization, lower the working 

301
00:16:27,200 --> 00:16:28,680
capital investments in 
inventory. 

302
00:16:28,680 --> 00:16:31,200
That is to me the expected bull 
mountain, right. 

303
00:16:31,800 --> 00:16:35,680
But there is another benefit 
that is not as quantitative, but

304
00:16:35,680 --> 00:16:38,800
it's the fact that more than 
ever supply chain has the 

305
00:16:38,800 --> 00:16:41,400
copilot role of any business of 
today. 

306
00:16:41,840 --> 00:16:44,720
I just talked to a customer that
we are providing training, for 

307
00:16:44,720 --> 00:16:48,960
example, not just to the supply 
chain planning team, but to the 

308
00:16:48,960 --> 00:16:52,960
rest of the stakeholders in the 
business organization because 

309
00:16:52,960 --> 00:16:56,040
they want to learn what 
inventory planning mean, what 

310
00:16:56,040 --> 00:16:59,560
does it mean to them, to their 
benefits above and beyond just 

311
00:16:59,560 --> 00:17:01,160
the supply chain planning 
organization. 

312
00:17:01,240 --> 00:17:05,760
Now inventory is a topic at the 
CFOCEO level. 

313
00:17:06,119 --> 00:17:08,280
Supply chain is driving that 
conversation. 

314
00:17:08,800 --> 00:17:12,599
And it's not just a how can I 
cut costs, it's how can I drive?

315
00:17:12,599 --> 00:17:15,720
Value. 
It used to be that the CFO or 

316
00:17:15,720 --> 00:17:19,079
company will come and say you 
got to cut down inventory by 

317
00:17:19,079 --> 00:17:21,960
this much. 
Right now is a bottom up 

318
00:17:21,960 --> 00:17:26,800
approach and that is only 
possible if supply chain takes a

319
00:17:26,800 --> 00:17:30,520
leap forward in the weighted 
plan and manage the business. 

320
00:17:31,160 --> 00:17:33,680
The wonderful aspect of what I'm
seeing going back to the best 

321
00:17:33,680 --> 00:17:37,320
practice of strategies right now
is that now you're building 

322
00:17:37,680 --> 00:17:39,760
elements of supply chain 
management like inventory 

323
00:17:39,760 --> 00:17:43,080
management coming from a bottom 
up perspective within 

324
00:17:43,080 --> 00:17:45,240
corporations. 
And so the supply chain 

325
00:17:45,240 --> 00:17:48,720
leadership now is working in 
tangent with the CFO to make a 

326
00:17:48,720 --> 00:17:52,080
joint commitment of what those 
inventory projections will be. 

327
00:17:52,800 --> 00:17:56,400
That marriage has to do with the
fact that now operations 

328
00:17:56,600 --> 00:17:59,920
realistically can say this is 
what we're going to commit, can 

329
00:17:59,920 --> 00:18:03,280
be aligned with finance, right, 
those financial requirements of 

330
00:18:03,280 --> 00:18:05,600
the business. 
And finance now feels more 

331
00:18:05,600 --> 00:18:09,160
comfortable hopefully because 
these are decisions based on 

332
00:18:09,200 --> 00:18:13,920
actual operational metrics, not 
some sort of wishful thinking, 

333
00:18:14,040 --> 00:18:18,760
right, or forcing the wheel when
that might have consequential 

334
00:18:18,760 --> 00:18:20,680
impact to your operations, to 
your business. 

335
00:18:20,680 --> 00:18:22,600
So that makes that goal 
unattainable. 

336
00:18:23,440 --> 00:18:27,240
A little earlier, you talked 
about getting better data and 

337
00:18:27,720 --> 00:18:31,640
having accurate demand and they 
know that late last year Western

338
00:18:31,640 --> 00:18:35,600
Africa announced a partnership 
with Alloy AI and we had Joel on

339
00:18:35,600 --> 00:18:38,440
the podcast a few months ago. 
So can you share a little bit 

340
00:18:38,440 --> 00:18:42,400
about the partnership and how 
that combination of SAP, Alloy 

341
00:18:42,400 --> 00:18:45,520
AI and Western market can help 
our joint customers? 

342
00:18:45,800 --> 00:18:47,880
Yep. 
So I will start with the 

343
00:18:47,880 --> 00:18:49,480
following. 
This partnership is a 

344
00:18:49,480 --> 00:18:51,520
professional dream come true for
me. 

345
00:18:51,600 --> 00:18:56,560
Over a decade ago, I worked on a
project where we wanted to get 

346
00:18:56,560 --> 00:19:00,920
visibility to POS data to 
improve our deployment planning.

347
00:19:01,480 --> 00:19:03,960
Think about this. 
About 10-15 years ago, that was 

348
00:19:04,000 --> 00:19:07,200
a project that I worked on. 
It was cumbersome, difficult 

349
00:19:07,360 --> 00:19:10,920
just to get the data from 1 
retailer was a lone project. 

350
00:19:11,400 --> 00:19:14,560
The technology was very early 
on. 

351
00:19:15,240 --> 00:19:18,440
And retailers went at the time 
keen to share information. 

352
00:19:18,440 --> 00:19:22,840
They were not keen to share. 
It was a fantastic thing, but we

353
00:19:22,840 --> 00:19:26,000
were able to get the benefits 
actually, but it was really 

354
00:19:26,000 --> 00:19:29,840
hard, but the hardest part was 
to be able to sustain that over 

355
00:19:29,840 --> 00:19:33,520
time. 
I met with the LOAI team about a

356
00:19:33,520 --> 00:19:36,440
year ago and it was a wonderful 
opportunity because they were 

357
00:19:36,480 --> 00:19:40,760
looking for a partner where we 
could integrate the LOAI retail 

358
00:19:40,760 --> 00:19:45,360
data to SAPIBP, the supply chain
planning solution at SAP. 

359
00:19:45,720 --> 00:19:48,440
And technically we did it. 
We actually went through the 

360
00:19:48,440 --> 00:19:51,440
testing, built integration, 
standard templates to be able to

361
00:19:51,440 --> 00:19:54,720
pull that data. 
And because of the data that we 

362
00:19:54,720 --> 00:19:58,720
pull was based on anonymized 
actual data, we were able to 

363
00:19:58,720 --> 00:20:03,000
plug this into what corresponds 
into the demand planning process

364
00:20:03,000 --> 00:20:06,880
in SAPIDP. 
The results were outstanding 

365
00:20:07,280 --> 00:20:11,360
because when you get the level 
of granularity being forecasted 

366
00:20:11,360 --> 00:20:16,200
at SAPIDP at the level that we 
observe, the accuracies of that 

367
00:20:16,200 --> 00:20:21,160
forecast were phenomenal, above 
50 percent, 60% in some cases. 

368
00:20:21,320 --> 00:20:24,680
Now it's not a silver bullet. 
But what is true is that is 

369
00:20:24,680 --> 00:20:30,680
easier, faster, comprehensive 
way of consuming POS retail 

370
00:20:30,680 --> 00:20:32,840
data. 
All the retail data, including 

371
00:20:32,840 --> 00:20:38,240
the POS data, be able to bring 
it into IBP to create a demand 

372
00:20:38,240 --> 00:20:42,720
plan that can tell you where 
that data is useful or what 

373
00:20:42,720 --> 00:20:46,560
brands at what locations for 
what customers and be able to 

374
00:20:46,560 --> 00:20:49,760
benchmark it against traditional
demand planning data like the 

375
00:20:50,080 --> 00:20:54,160
sales records, shipping records.
And it's easy to do, easy to 

376
00:20:54,160 --> 00:20:56,000
implement. 
So what is the idea? 

377
00:20:56,000 --> 00:21:00,840
The idea is to complement the 
LOAI data into the main planning

378
00:21:00,840 --> 00:21:07,080
in SAPIVP and provided an option
that can produce better forecast

379
00:21:07,080 --> 00:21:09,760
accuracy. 
Then the second level of this 

380
00:21:10,360 --> 00:21:13,080
and a lot of customers that are 
there already is that. 

381
00:21:13,080 --> 00:21:14,800
What do I do with that better 
forecast? 

382
00:21:14,800 --> 00:21:16,880
Well, it can serve multiple 
purposes. 

383
00:21:17,400 --> 00:21:21,280
It can be fed as a current 
update to your SNLP process. 

384
00:21:21,560 --> 00:21:25,840
And most importantly, can I make
better deployment decisions in 

385
00:21:25,840 --> 00:21:29,240
the short term, the next 90 days
that can lead to better 

386
00:21:29,240 --> 00:21:32,960
allocation of inventory, but 
also improve service levels. 

387
00:21:33,520 --> 00:21:35,560
There is a very tactical 
benefit. 

388
00:21:36,320 --> 00:21:37,840
There might be a long term 
benefit. 

389
00:21:37,880 --> 00:21:41,480
Right now I'm focused on the 
short term because that gives 

390
00:21:41,480 --> 00:21:44,000
the biggest impact. 
But yeah, so that's where the 

391
00:21:44,000 --> 00:21:47,120
partnership comes along. 
It is a solution geared towards 

392
00:21:47,120 --> 00:21:49,480
the Consumer Packaged Goods 
industry and that's what we're 

393
00:21:49,480 --> 00:21:51,080
working on, right? 
Now, cool. 

394
00:21:52,320 --> 00:21:55,480
We're coming to the end of the 
podcast, Alexis, but maybe take 

395
00:21:55,480 --> 00:21:59,160
a minute to talk a little bit 
about people who want to learn 

396
00:21:59,160 --> 00:22:01,600
more. 
Where can they learn more about 

397
00:22:01,600 --> 00:22:06,240
the partnership with SAP, the 
partnership with Aloe I, or 

398
00:22:06,240 --> 00:22:08,480
Westernacor in general? 
Yeah. 

399
00:22:08,480 --> 00:22:11,880
So I would invite everyone 
listening to these podcasts to 

400
00:22:11,880 --> 00:22:15,280
visit us at westernacor.com. 
We also have some LinkedIn 

401
00:22:15,280 --> 00:22:18,120
pages, one for a global 
Westernacor, but also for 

402
00:22:18,120 --> 00:22:21,800
Westernacor US with global, but 
we also have regional 

403
00:22:21,800 --> 00:22:24,760
positioning because we adapt to 
every market. 

404
00:22:24,760 --> 00:22:28,160
And we know that globally we 
cannot speak to every market or 

405
00:22:28,160 --> 00:22:30,280
every industry. 
That's a kind of a smart 

406
00:22:30,280 --> 00:22:33,040
strategy we have. 
But yeah, westernrecord.com, if 

407
00:22:33,040 --> 00:22:37,600
you want to learn more about us,
that website has all the videos,

408
00:22:37,600 --> 00:22:41,880
webinars, blogs, content across 
all of our practices. 

409
00:22:41,880 --> 00:22:44,160
But in the world of supply chain
planning, I work with 

410
00:22:44,160 --> 00:22:47,320
outstanding citizens across the 
globe that we're writing about 

411
00:22:47,320 --> 00:22:50,040
multiple topics. 
Service level prediction, supply

412
00:22:50,040 --> 00:22:52,360
lead time, how to get ready for 
SAPIVP. 

413
00:22:52,880 --> 00:22:55,560
How do we do a SNOP 
transformation? 

414
00:22:55,720 --> 00:22:58,640
How do we move from APO to IVP? 
We were there. 

415
00:22:58,960 --> 00:23:01,920
You name it, Richard, we have 
written about the wealth of our 

416
00:23:01,920 --> 00:23:05,120
experience in this space. 
It sounds like a treasure shove 

417
00:23:05,120 --> 00:23:07,840
of information, so we'll make 
sure that we share that link in 

418
00:23:07,840 --> 00:23:10,680
the show notes. 
But I do have one final question

419
00:23:10,680 --> 00:23:13,320
that I ask all of my guests. 
Interesting to get your 

420
00:23:13,320 --> 00:23:16,440
viewpoint on this, but if you 
could give in a sentence or two,

421
00:23:16,560 --> 00:23:18,800
what do you see as the future of
supply chain? 

422
00:23:20,360 --> 00:23:24,280
The future to me is go back to 
the principles of supply chain 

423
00:23:24,280 --> 00:23:28,200
continuous improvement. 
That is the 2 words that never 

424
00:23:28,200 --> 00:23:31,440
goes away when I think about the
future of supply chain, You can 

425
00:23:31,440 --> 00:23:35,000
never succeed in supply chain 
without continuous improvement. 

426
00:23:35,520 --> 00:23:37,800
If you're not changing things, 
if you're not thinking about 

427
00:23:37,800 --> 00:23:39,920
change, you're in the wrong 
business. 

428
00:23:40,560 --> 00:23:44,240
You're right. 
If you think about this, I'm 

429
00:23:44,240 --> 00:23:46,960
going to go back to a word that 
I used earlier, robustness, 

430
00:23:47,760 --> 00:23:51,160
uncertainty will always be there
for supply chains. 

431
00:23:51,400 --> 00:23:56,320
How do we build robustness And 
that itself changes over time. 

432
00:23:56,960 --> 00:23:59,120
Building robustness will change 
over time. 

433
00:23:59,320 --> 00:24:02,760
Robustness of 10 years ago, what
you were focusing on to build 

434
00:24:02,760 --> 00:24:04,720
that robustness is completely 
different today. 

435
00:24:05,000 --> 00:24:07,720
I'll give you an example. 
We are living in very 

436
00:24:07,720 --> 00:24:11,400
interesting political times 
globally that will have an 

437
00:24:11,400 --> 00:24:15,440
impact to businesses worldwide. 
So how do we prepare for that, 

438
00:24:15,560 --> 00:24:17,840
right. 
A lot is in the line for sure, 

439
00:24:18,240 --> 00:24:22,120
but how do we prepare for that? 
And that is to be robustness and

440
00:24:22,120 --> 00:24:25,440
continuous improvement. 
Alexis, thanks for a great 

441
00:24:25,440 --> 00:24:27,320
conversation. 
It's been really interesting, 

442
00:24:27,320 --> 00:24:29,400
really eye opening and really 
educational. 

443
00:24:29,880 --> 00:24:31,440
Yeah. 
Thank you, Richard. 

444
00:24:31,720 --> 00:24:34,440
No problem and thanks everyone 
for listening. 

445
00:24:34,640 --> 00:24:37,680
Please mark us as a favorite. 
You can get regular updates and 

446
00:24:37,680 --> 00:24:40,960
information about future 
episodes, but until next time 

447
00:24:40,960 --> 00:24:44,160
from Alexis and I, thanks for 
discussing the future of Supply 

448
00:24:44,160 --> 00:24:44,480
Chain.