1
00:00:10,000 --> 00:00:12,800
Welcome to the everyday p.m. 
Podcast, the podcast, where we 

2
00:00:12,800 --> 00:00:15,700
discussed project management 
principles for your everyday 

3
00:00:15,700 --> 00:00:18,000
life. 
My name is Ann campea, and I'm a

4
00:00:18,000 --> 00:00:21,500
certified project / program 
manager with over a decade of 

5
00:00:21,500 --> 00:00:23,200
experience working for 
healthcare. 

6
00:00:23,400 --> 00:00:26,500
Retail consumer goods and Tech 
Industries. 

7
00:00:26,800 --> 00:00:29,900
I am so excited to welcome two 
very special. 

8
00:00:30,000 --> 00:00:33,300
Yes, and if you are a Avid 
follower of the everyday p.m. 

9
00:00:33,600 --> 00:00:37,700
You will have seen or listen to 
another episode with both Mark 

10
00:00:37,700 --> 00:00:40,500
and Greg on it. 
So I am welcoming them back to 

11
00:00:40,500 --> 00:00:43,800
the podcast, Mark, and Greg. 
Thank you so much for joining me

12
00:00:43,800 --> 00:00:46,900
again. 
And today we are talking about 

13
00:00:46,900 --> 00:00:51,000
why projects fail. 
This is such an exciting topic. 

14
00:00:51,000 --> 00:00:53,700
I can't wait to dig in. 
But before we do that, let's 

15
00:00:53,700 --> 00:00:57,100
have both of my guests introduce
themselves to our audience. 

16
00:00:57,100 --> 00:00:59,800
So Greg, why don't we start with
you for those who have not? 

17
00:01:00,100 --> 00:01:02,800
You yet, although you've been 
on, I don't know. 

18
00:01:02,800 --> 00:01:05,000
What is this. 
May be your fifth episode of the

19
00:01:05,000 --> 00:01:07,500
everyday p.m. 
Podcast for those who have not 

20
00:01:07,500 --> 00:01:09,100
met you yet for our new 
audience. 

21
00:01:09,100 --> 00:01:11,400
Please take a brief moment to 
introduce yourself. 

22
00:01:12,000 --> 00:01:13,800
Thank you will. 
And thanks for having me on 

23
00:01:13,800 --> 00:01:15,900
again. 
And my name is Greg kristensen. 

24
00:01:15,900 --> 00:01:17,700
I'm, the vice president of 
project Hub. 

25
00:01:17,700 --> 00:01:21,200
That's a project management 
software solution and I'm happy 

26
00:01:21,200 --> 00:01:23,200
to be here with you. 
Once again to cover. 

27
00:01:23,200 --> 00:01:26,400
Another interesting topic that 
should help people get their 

28
00:01:26,400 --> 00:01:29,800
projects moving Faster by 
learning why they fail. 

29
00:01:30,600 --> 00:01:33,700
Awesome and Mark. 
Hey, thanks for having me and 

30
00:01:35,800 --> 00:01:38,300
I've written a bunch of books on
project management. 

31
00:01:38,300 --> 00:01:42,500
I created the visual project 
management methodology called 

32
00:01:42,500 --> 00:01:49,100
Viewpoint and that's kind of 
what I'm promoting and I've done

33
00:01:49,100 --> 00:01:52,000
lots of big projects. 
Lots of small ones, lots of made

34
00:01:52,000 --> 00:01:56,200
lots of mistakes to so but we're
going to talk about those are 

35
00:01:56,200 --> 00:02:01,700
are we now? 
So, let's go ahead and dig in 

36
00:02:01,700 --> 00:02:06,400
dig in here because this is such
a great kind of very macro topic

37
00:02:06,400 --> 00:02:09,300
that we can easily get into dive
into the details about. 

38
00:02:09,300 --> 00:02:12,500
But I want to kind of start with
some statistics that I pulled up

39
00:02:12,500 --> 00:02:16,700
from the interwebs here in terms
of, you know, the most recent 

40
00:02:16,700 --> 00:02:19,700
percentages of projects that are
considered to have been 

41
00:02:19,700 --> 00:02:23,100
failures. 
So we're hovering at about 70%, 

42
00:02:23,100 --> 00:02:26,000
right? 
According to PMI and about 42 

43
00:02:26,000 --> 00:02:29,500
percent of the companies that 
reported in say that they the 

44
00:02:29,500 --> 00:02:31,900
reason they failed is just 
because they didn't understand 

45
00:02:31,900 --> 00:02:36,700
the importance of the project or
of project management, which 

46
00:02:37,400 --> 00:02:40,300
baffling to me. 
The other percent here I have is

47
00:02:40,300 --> 00:02:44,100
55% of project. 
Managed project managers cited 

48
00:02:44,100 --> 00:02:48,700
that it was budget overruns or 
or something of that sort. 

49
00:02:48,700 --> 00:02:50,300
That was the reason for project 
failure. 

50
00:02:50,300 --> 00:02:54,400
So anyhow, I think that those 
statistics kind of set us up for

51
00:02:54,600 --> 00:02:59,400
this environment of you can plan
to fail your project manager, 

52
00:02:59,400 --> 00:03:01,000
you doing. 
You can, but your project, 

53
00:03:01,000 --> 00:03:04,200
there's still a chance of that 
project going awry. 

54
00:03:04,200 --> 00:03:07,500
So let's start with your 
definition of failure. 

55
00:03:07,500 --> 00:03:10,400
I think it's important to kind 
of give us a foundation of what 

56
00:03:10,400 --> 00:03:13,100
we're talking about here. 
So, Mark, why don't we start 

57
00:03:13,100 --> 00:03:15,300
with, how do you define project 
failure? 

58
00:03:15,700 --> 00:03:19,800
Well, project will fail. 
If it doesn't deliver on time. 

59
00:03:20,100 --> 00:03:24,500
If it doesn't produce the result
that the project was designed to

60
00:03:24,500 --> 00:03:29,000
do and I think those are the two
big things over budget. 

61
00:03:29,000 --> 00:03:32,200
I mean some people will Say, 
well, the project failed because

62
00:03:32,200 --> 00:03:35,700
it was over budget, but I've 
never seen a project that is 

63
00:03:35,700 --> 00:03:39,200
actually came in at budget. 
So, sort of, you know, it's not 

64
00:03:39,200 --> 00:03:41,300
a failure. 
Just more expensive than people 

65
00:03:41,300 --> 00:03:42,800
thought it was going to be. 
Yeah. 

66
00:03:43,200 --> 00:03:45,600
Yeah, fair enough. 
And how about you Greg? 

67
00:03:46,600 --> 00:03:51,100
Well, interestingly enough. 
I hang my hat on the delivery 

68
00:03:51,100 --> 00:03:53,700
deadline. 
I think they had that everything

69
00:03:53,700 --> 00:03:55,900
is all about delivering your 
project on time. 

70
00:03:56,000 --> 00:03:59,500
I would agree with Mark that 
budgets really common. 

71
00:03:59,500 --> 00:04:02,500
There is Few other factors, but 
I like to hang my hat on the 

72
00:04:02,500 --> 00:04:04,600
date. 
If you can deliver on time and 

73
00:04:04,600 --> 00:04:06,800
deliver, what was promised that 
right? 

74
00:04:06,800 --> 00:04:10,600
There should be a huge win. 
The other things can be dealt 

75
00:04:10,600 --> 00:04:14,500
with and then kind of adding 
onto both of your definitions. 

76
00:04:14,500 --> 00:04:18,000
There is, I tend to harp on 
quality. 

77
00:04:18,399 --> 00:04:20,500
I've worked in consumer goods 
for so long. 

78
00:04:20,500 --> 00:04:23,500
That if I put a product out 
there that has some sort of 

79
00:04:23,500 --> 00:04:26,500
technical failure. 
Then I feel like the project has

80
00:04:26,500 --> 00:04:28,000
failed. 
We've missed something. 

81
00:04:28,300 --> 00:04:32,400
And so anything that is a Above 
are excuse me below, par in 

82
00:04:32,400 --> 00:04:35,000
terms of the our quality 
measures and what we expected 

83
00:04:35,000 --> 00:04:37,800
the product to do. 
I do I would consider that for 

84
00:04:37,800 --> 00:04:42,200
myself a project failure. 
So I think go ahead. 

85
00:04:42,500 --> 00:04:47,200
Well, I was gonna say I as well.
That's sort of falls in the 

86
00:04:47,200 --> 00:04:48,700
project. 
Deliver what it was supposed to 

87
00:04:48,700 --> 00:04:52,200
do, you know, often it's a 
working project or product. 

88
00:04:52,200 --> 00:04:55,300
It's a working product or a 
product that will be successful 

89
00:04:55,300 --> 00:04:58,000
in the marketplace or the piece 
of software. 

90
00:04:58,300 --> 00:04:59,800
That doesn't work the way. 
It's supposed to. 

91
00:04:59,900 --> 00:05:03,300
Or, you know, anything that 
falls outside of this 

92
00:05:03,300 --> 00:05:05,900
specifications of what the 
project is supposed to deliver 

93
00:05:05,900 --> 00:05:10,100
is a failure. 
So, I'm sorry to interrupt. 

94
00:05:10,500 --> 00:05:12,200
No. 
No, that's this is a 

95
00:05:12,207 --> 00:05:13,200
conversation. 
Right? 

96
00:05:13,200 --> 00:05:17,200
So Mark, I think you've written 
about why projects fail and now 

97
00:05:17,200 --> 00:05:19,600
that we have our foundation for 
this conversation. 

98
00:05:20,800 --> 00:05:21,900
What? 
Why? 

99
00:05:22,000 --> 00:05:24,600
Why I think that's the question.
We all want to know why do 

100
00:05:24,600 --> 00:05:28,800
projects fail. 
Well, I think there are there 

101
00:05:28,800 --> 00:05:34,000
five. 
Things that are contributing to 

102
00:05:36,200 --> 00:05:42,400
the project failure and none of 
those are the plan none of them,

103
00:05:43,400 --> 00:05:48,200
you know, because plans no plan 
is no plan is perfect. 

104
00:05:48,200 --> 00:05:50,600
Right? 
There's just no sense. 

105
00:05:50,600 --> 00:05:52,700
So, I've got it. 
Boiled down to like five 

106
00:05:52,700 --> 00:05:56,400
different things. 
And one of the things that 

107
00:05:56,400 --> 00:06:00,300
happens in project management 
during execution is, That 

108
00:06:00,400 --> 00:06:04,700
project the project processes 
tends to focus on what have we 

109
00:06:04,700 --> 00:06:07,400
accomplished instead of what do 
we need to accomplish? 

110
00:06:07,400 --> 00:06:08,800
Right? 
And we talked about that. 

111
00:06:09,000 --> 00:06:13,100
The last time we were together. 
The other thing is, you know, 

112
00:06:13,100 --> 00:06:19,400
how, how flexible is the team is
the team inflexible. 

113
00:06:19,400 --> 00:06:24,500
Well, this is not my job, but I 
sent this guy an email, but I'm 

114
00:06:24,500 --> 00:06:27,800
looking at, you know, people 
are, you know, do they have the 

115
00:06:27,800 --> 00:06:29,700
same objective? 
Right is everybody? 

116
00:06:29,800 --> 00:06:32,600
Beyond the project team had the 
same objective to deliver. 

117
00:06:32,600 --> 00:06:35,700
The project is a crystal-clear 
year in this project. 

118
00:06:35,700 --> 00:06:37,900
This is what you're going to do 
while you're here. 

119
00:06:38,200 --> 00:06:41,100
And so many times I've seen 
particularly in 

120
00:06:41,800 --> 00:06:43,600
multidisciplinary projects to 
me. 

121
00:06:43,600 --> 00:06:46,700
You've got the engineers. 
You've got the Fabricators a 

122
00:06:46,700 --> 00:06:48,800
production here. 
They're all operating in their 

123
00:06:48,800 --> 00:06:51,400
silos. 
And the only person that really 

124
00:06:51,400 --> 00:06:54,400
is owning. 
The project is the project 

125
00:06:54,400 --> 00:06:56,300
manager and the project sponsor,
right? 

126
00:06:56,300 --> 00:07:00,500
Those are the other two people. 
And so I see that if Teams are 

127
00:07:01,000 --> 00:07:07,000
not don't have the same goal. 
Then project was definitely be 

128
00:07:07,000 --> 00:07:10,400
extremely difficult to manage 
highly unlikely to succeed. 

129
00:07:12,000 --> 00:07:16,100
The other thing that I see is 
that when the priorities the 

130
00:07:16,100 --> 00:07:18,900
test priorities, for the people 
who are on the project are 

131
00:07:18,900 --> 00:07:24,100
unclear or conflicting or 
constantly changing, you know, 

132
00:07:24,100 --> 00:07:28,000
that's going to be creating a 
lot of noise in the project 

133
00:07:28,100 --> 00:07:32,000
delivery process. 
And then fourth is. 

134
00:07:34,000 --> 00:07:37,800
We don't know where the 
constraint is for the project. 

135
00:07:38,200 --> 00:07:43,900
So I think take a page out of 
goldratt spoke. 

136
00:07:43,900 --> 00:07:48,500
You know, the constraint is the 
thing that is limiting the 

137
00:07:48,500 --> 00:07:50,500
product project from moving 
forward. 

138
00:07:50,500 --> 00:07:54,200
And it's not clear what that 
constraint is where that 

139
00:07:54,200 --> 00:07:56,800
Leverage is. 
So people would get focused out 

140
00:07:56,800 --> 00:07:59,300
of the weeds and they start 
working on the wrong things. 

141
00:07:59,300 --> 00:08:03,200
And so that project, and then 
number five is just Pain 

142
00:08:03,200 --> 00:08:06,300
sadness, you know, the tempo of 
the project, you know, 

143
00:08:06,300 --> 00:08:09,000
sometimes, you know, we send an 
email and then we played a week 

144
00:08:09,100 --> 00:08:10,400
and it's our next project 
meeting. 

145
00:08:10,400 --> 00:08:12,800
Oh my gosh, like, I never got 
back to me, you know, or 

146
00:08:12,800 --> 00:08:15,100
whatever, right? 
Then the team is slow. 

147
00:08:15,100 --> 00:08:23,400
So focusing on the past mixed 
messages on what the goal is 

148
00:08:24,900 --> 00:08:26,900
priorities. 
Constantly shifting. 

149
00:08:27,300 --> 00:08:29,800
We don't know where the 
constraint is and slow response.

150
00:08:29,800 --> 00:08:32,000
That's five. 
So, I spent a lot of time 

151
00:08:32,000 --> 00:08:35,400
talking about this fight. 
Sorry, no, no don't apologize. 

152
00:08:35,400 --> 00:08:38,600
It just got me thinking about, 
you know, when I started my 

153
00:08:38,600 --> 00:08:42,500
career as a p.m. 
One of the things that I kind of

154
00:08:42,500 --> 00:08:46,100
really just became ingrained in 
my the way I conduct myself is 

155
00:08:46,100 --> 00:08:51,200
that no matter who's failing 
within the project team that It 

156
00:08:51,200 --> 00:08:53,800
ultimately rests on the project,
managers shoulders. 

157
00:08:53,800 --> 00:08:56,900
And so as you're talking through
those Five Points, it kind of 

158
00:08:56,900 --> 00:09:02,400
brings me back to this the 
thought of do you believe that 

159
00:09:02,600 --> 00:09:06,800
of Those five the project 
manager has any type of control 

160
00:09:06,800 --> 00:09:09,800
over trying to bring the project
back on track? 

161
00:09:10,500 --> 00:09:15,900
Yeah, no, not typically because 
I think if we take just take the

162
00:09:15,900 --> 00:09:19,200
first one, the first one the 
project manager does focusing on

163
00:09:19,200 --> 00:09:23,600
the on the future and you know, 
changing the emphasis of the 

164
00:09:23,600 --> 00:09:27,500
team from reporting on what they
have done and telling you what 

165
00:09:27,500 --> 00:09:30,600
the problems are and Shifting 
the emphasis from that, to, 

166
00:09:30,600 --> 00:09:32,200
okay. 
What are we going to do today? 

167
00:09:32,200 --> 00:09:34,600
What we're going to This weekend
who's going to do it. 

168
00:09:34,600 --> 00:09:39,000
That is the job of the project 
manager, but the project manager

169
00:09:39,000 --> 00:09:42,100
can't fix the project manager 
alone. 

170
00:09:42,100 --> 00:09:48,500
Cannot fix the problem of mixed 
or incorrect, reward systems. 

171
00:09:48,800 --> 00:09:53,500
So for example, purchasing guy, 
you know, he is, he's being 

172
00:09:53,500 --> 00:09:55,900
measured on purchase price. 
Variance. 

173
00:09:55,900 --> 00:09:58,000
Did I get the cheapest one or 
did I get it? 

174
00:09:58,000 --> 00:09:59,700
You know, did I get the right 
vendor? 

175
00:10:00,100 --> 00:10:02,800
And so you're bringing this 
supply chain guy on. 

176
00:10:03,000 --> 00:10:06,600
Org are Gala on to your team? 
And they're you know, your 

177
00:10:06,600 --> 00:10:09,200
project is in trouble. 
And you need to this supplier to

178
00:10:09,200 --> 00:10:12,400
get moving air freight Charter, 
playing whatever it is, to get 

179
00:10:12,400 --> 00:10:15,800
this item that you need. 
But the purchasing guy says, 

180
00:10:15,800 --> 00:10:18,500
well, if I do that then you 
know, I'm going to my metric is 

181
00:10:18,500 --> 00:10:21,400
going to suffer. 
So and so the project manager is

182
00:10:21,400 --> 00:10:23,600
not going to have control over 
that because that's an 

183
00:10:23,600 --> 00:10:26,000
organization. 
You should not p.m. 

184
00:10:26,000 --> 00:10:28,100
Now, the p.m. 
Can recognize it and Elevate 

185
00:10:28,100 --> 00:10:32,900
that, but certainly the problem 
of the mixed. 

186
00:10:33,000 --> 00:10:37,600
Ward's of or incorrect rewards 
will definitely is out of their 

187
00:10:37,600 --> 00:10:39,500
scope. 
Got it. 

188
00:10:39,500 --> 00:10:43,800
Yeah, and that now project 
managers can work on the task 

189
00:10:43,800 --> 00:10:47,400
priorities. 
If we, if we know what the work 

190
00:10:47,400 --> 00:10:51,000
is and where we're going to do, 
you know, the project manager 

191
00:10:51,000 --> 00:10:53,700
can focus on that. 
But what I see is, you know, a 

192
00:10:53,700 --> 00:10:56,700
lot of project managers are 
playing whack-a-mole, you know 

193
00:10:56,700 --> 00:11:00,500
or just responding to the boss 
or whatever the thing is and 

194
00:11:00,500 --> 00:11:02,800
don't have a good sense of 
pushing. 

195
00:11:02,900 --> 00:11:05,900
Back and say, listen, you know, 
you giving me this priority that

196
00:11:05,900 --> 00:11:08,200
I've got to do this thing. 
But if I do this thing, then 

197
00:11:08,200 --> 00:11:09,900
there's other things going to 
suffer. 

198
00:11:10,300 --> 00:11:13,000
And that's certainly something 
that the project manager has 

199
00:11:13,000 --> 00:11:17,600
control over the project manager
can also know where the 

200
00:11:17,600 --> 00:11:21,800
constraint is. 
Damn straight shows up. 

201
00:11:21,800 --> 00:11:25,700
It's not it's not hard to spot. 
It's you know, I think if you 

202
00:11:25,700 --> 00:11:28,700
ask the project team or second 
string goes Herbie, he's over 

203
00:11:28,700 --> 00:11:32,700
there, you know, everybody knows
who it is because that person or

204
00:11:32,700 --> 00:11:36,200
that department, that supplier, 
they're being named in every 

205
00:11:36,200 --> 00:11:38,100
project meeting that you go to 
the, right? 

206
00:11:38,100 --> 00:11:41,300
So, it's not. 
But what project managers don't 

207
00:11:41,300 --> 00:11:45,400
necessarily recognize that, that
is the critical leverage point 

208
00:11:45,400 --> 00:11:50,400
to push your project forward. 
And that's certainly the job of 

209
00:11:50,400 --> 00:11:53,900
the project manager to break 
that bottle leg and get it 

210
00:11:53,900 --> 00:11:56,800
elevated to the right person. 
And then of course, the 

211
00:11:56,800 --> 00:12:02,300
responsiveness the project 
manager, you know, I don't want 

212
00:12:02,300 --> 00:12:04,400
the project. 
I never thought that the project

213
00:12:04,400 --> 00:12:07,800
manager should be the task 
police now. 

214
00:12:11,000 --> 00:12:13,400
Well, the project manager can 
say, Hey, you know, we're 

215
00:12:13,400 --> 00:12:18,400
getting slow response, you know,
we need to pick up the tempo but

216
00:12:18,500 --> 00:12:20,500
That goes back to the 
measurement problem that I 

217
00:12:20,500 --> 00:12:23,700
talked about a minute ago. 
I mean, if people are not aware 

218
00:12:23,700 --> 00:12:27,500
that, you know, we had the rule 
24 hours, you know, any 

219
00:12:27,500 --> 00:12:29,000
question. 
Any problem, you have to respond

220
00:12:29,000 --> 00:12:32,200
to 24 hours and that is the 
project manager can set that 

221
00:12:32,200 --> 00:12:37,200
expectation and enforce that 
expectation through smart 

222
00:12:37,200 --> 00:12:40,100
management. 
Meaning, you know, if I've got a

223
00:12:40,108 --> 00:12:43,000
team of people and, you know, a 
little will pick on the supply 

224
00:12:43,000 --> 00:12:47,100
chain guy again, just because I 
like the supply chain, guys, you

225
00:12:47,100 --> 00:12:52,300
know, the But the, you know, the
the project manager can work 

226
00:12:52,300 --> 00:12:55,400
with the leader of the project 
of the supply chain 

227
00:12:55,400 --> 00:12:57,700
organizational, say listen, we 
need 24-hour. 

228
00:12:57,700 --> 00:13:00,000
Can you help me with that? 
And that's something that 

229
00:13:00,000 --> 00:13:02,900
certainly is in the control of 
the project manager. 

230
00:13:03,300 --> 00:13:04,400
Choi. 
Sure. 

231
00:13:04,800 --> 00:13:07,400
So really the big, the big 
everything is in the project 

232
00:13:07,400 --> 00:13:14,500
managers realm of control except
getting all the people on the 

233
00:13:14,500 --> 00:13:17,800
project on the project. 
Got it. 

234
00:13:17,900 --> 00:13:19,300
Yeah. 
Sense, Greg. 

235
00:13:19,300 --> 00:13:23,500
What do you think about that? 
Well, as you know, and we talked

236
00:13:23,500 --> 00:13:26,900
about it on previous episodes. 
I've been consuming a lot of the

237
00:13:26,900 --> 00:13:30,800
things that Mark is written. 
I'm a little bit more, well, 

238
00:13:30,800 --> 00:13:34,800
versed than I probably really am
if that makes any sense because 

239
00:13:35,900 --> 00:13:38,800
a lot of it makes sense to me, 
kind of naturally because of one

240
00:13:38,800 --> 00:13:41,200
of our, what I've already 
consumed of his and then I'm a 

241
00:13:41,200 --> 00:13:45,500
little bit familiar with 
goldratt and his Concepts and so

242
00:13:45,500 --> 00:13:48,700
I'm going to bring up something 
Mark brings up sometimes but 

243
00:13:48,700 --> 00:13:51,000
goldratt specifically says is a 
quote. 

244
00:13:51,300 --> 00:13:54,800
Show me how you measure me and 
I'll show you how I behave in 

245
00:13:54,800 --> 00:13:56,600
order. 
It really gets down to is the 

246
00:13:56,600 --> 00:13:58,400
behaviors. 
So you've got these project 

247
00:13:58,400 --> 00:14:02,700
managers that are trying to 
maintain and push and manage 

248
00:14:02,700 --> 00:14:05,600
that project. 
They've got a certain amount of 

249
00:14:05,600 --> 00:14:07,700
authority. 
They're empowered Etc. 

250
00:14:08,100 --> 00:14:11,600
But still who gets put in place 
that's not on them. 

251
00:14:11,700 --> 00:14:15,700
So they have to really fight at 
actually think I'm really 

252
00:14:15,700 --> 00:14:20,100
interested your answer on this 
and because you're really good 

253
00:14:20,100 --> 00:14:22,100
at that. 
You know, a lot of the soft 

254
00:14:22,100 --> 00:14:25,300
skills, a Zen approach to how to
get people kind of moving in the

255
00:14:25,300 --> 00:14:27,600
right direction marks, really 
big on. 

256
00:14:27,900 --> 00:14:29,600
Let's not worry about, who, 
what? 

257
00:14:29,600 --> 00:14:32,300
When yesterday, let's look at, 
where are we at? 

258
00:14:32,300 --> 00:14:33,900
Right now? 
Let's get things moving. 

259
00:14:33,900 --> 00:14:36,300
So I don't know if I really 
answered your question, but 

260
00:14:36,300 --> 00:14:39,900
that's what I'm doing here, is 
taking it in and realizing that 

261
00:14:40,000 --> 00:14:43,800
it's all about getting people 
moving the right way, focusing 

262
00:14:43,800 --> 00:14:47,200
on the right things and that's a
behavioral change. 

263
00:14:47,200 --> 00:14:49,200
That is a challenge as you go 
down line. 

264
00:14:49,900 --> 00:14:53,300
Yeah, and Afraid to commit, 
right? 

265
00:14:53,300 --> 00:14:56,200
I think there's a lot of moving 
Parts here and one of the most 

266
00:14:56,200 --> 00:14:59,100
unpredictable variables is the 
people. 

267
00:14:59,500 --> 00:15:01,900
It's the people that you inherit
on your team. 

268
00:15:01,900 --> 00:15:04,900
It's the people who are 
sponsoring the project and I 

269
00:15:04,908 --> 00:15:08,600
think what you're saying Mark is
that, wow, we have so much 

270
00:15:08,600 --> 00:15:12,300
control over some of the 
parameters that are set forth 

271
00:15:12,800 --> 00:15:16,500
within our project as a project 
manager that there are really 

272
00:15:16,700 --> 00:15:21,000
some things that we either 
inherit or they come to us. 

273
00:15:21,100 --> 00:15:25,700
A specific way and it will it 
might take Moving Mountains to 

274
00:15:25,700 --> 00:15:29,500
get that to, to be able to be 
something that we can control as

275
00:15:29,500 --> 00:15:31,700
project managers. 
Or maybe we just will never be 

276
00:15:31,700 --> 00:15:35,900
able to control that one 
variable in within the project 

277
00:15:35,900 --> 00:15:38,800
and that comes with. 
Even if you walk it back a 

278
00:15:38,800 --> 00:15:41,000
little bit, that could be 
company culture, that could be 

279
00:15:41,000 --> 00:15:44,600
the support of your leadership 
team, that could be, you know, 

280
00:15:44,600 --> 00:15:49,200
misalignment on company strategy
versus what the project is 

281
00:15:49,200 --> 00:15:51,000
actually executing against 
theirs. 

282
00:15:51,300 --> 00:15:54,000
There's a whole plethora of 
things that I've seen in my 

283
00:15:54,000 --> 00:15:56,500
experience that have led to 
project failure. 

284
00:15:56,800 --> 00:16:00,500
That really ultimately is out of
the control of the project 

285
00:16:00,500 --> 00:16:03,100
manager. 
I do think I inherited that 

286
00:16:03,100 --> 00:16:05,900
perception that everything is in
the control of the project 

287
00:16:05,900 --> 00:16:10,700
manager because I do tend to 
lead so much with empathy and 

288
00:16:10,700 --> 00:16:13,200
that, that tends to weigh on 
your shoulders. 

289
00:16:13,200 --> 00:16:18,200
If you, if you lead in that way,
because then you want to without

290
00:16:18,200 --> 00:16:21,200
thinking about it. 
You are inheriting all All of 

291
00:16:21,208 --> 00:16:24,700
the problems around you and 
you're trying to fix all the 

292
00:16:24,700 --> 00:16:29,100
problems around you which can be
come across as very authentic to

293
00:16:29,100 --> 00:16:30,800
some people. 
And that's how you manage the 

294
00:16:30,800 --> 00:16:34,100
people part of it, but then can 
on the flip side of it Playing 

295
00:16:34,100 --> 00:16:37,800
devil's, advocate to my own way 
that I lead can. 

296
00:16:37,800 --> 00:16:41,000
Then weigh very heavily on your 
shoulders and you think that you

297
00:16:41,000 --> 00:16:43,500
can control certain things of 
the project that are failing. 

298
00:16:43,500 --> 00:16:47,500
When ultimately if you look back
at it or you look at the root 

299
00:16:47,500 --> 00:16:50,200
cause it was something that was 
never in my control to begin 

300
00:16:50,200 --> 00:16:51,900
with. 
So I think Mark, you make a lot 

301
00:16:51,900 --> 00:16:56,500
of great points about what is in
our sphere of control as PMs. 

302
00:16:56,500 --> 00:17:01,200
And what is not and having this 
this mentality of don't harp on 

303
00:17:01,200 --> 00:17:03,900
the past for too long because 
the projects going to continue 

304
00:17:03,900 --> 00:17:07,000
to fail until you try to start 
focusing on the future and how 

305
00:17:07,000 --> 00:17:10,300
to get it back on track. 
So is there any I mean you 

306
00:17:10,300 --> 00:17:14,900
talked a lot about some of the 
signs and things that we can 

307
00:17:14,900 --> 00:17:17,900
look out for. 
But what what specifically are 

308
00:17:17,900 --> 00:17:20,300
some of the early warning signs 
that you've seen in your 

309
00:17:20,300 --> 00:17:22,599
experience in? 
And how have you been able to 

310
00:17:22,599 --> 00:17:25,000
troubleshoot that to get the 
project back on track? 

311
00:17:25,200 --> 00:17:27,800
Well, I think the, you know, the
first, the first one is, you 

312
00:17:27,800 --> 00:17:32,200
know, focusing on the past and 
that, you know, that's, I want 

313
00:17:32,200 --> 00:17:37,200
to say, that's the easiest thing
to fix, but it's easy because it

314
00:17:37,200 --> 00:17:41,200
doesn't require a lot of process
change or anything. 

315
00:17:41,200 --> 00:17:44,500
That's just changing your 
approach and how you approach 

316
00:17:44,600 --> 00:17:47,300
the task of managing the 
project, right? 

317
00:17:47,300 --> 00:17:51,000
So, you know, that sense of 
being future-oriented. 

318
00:17:51,200 --> 00:17:56,500
Do you know you can lead with 
mpany empathy and you know still

319
00:17:56,500 --> 00:17:59,900
focus on the future. 
I think what happens is, people 

320
00:17:59,900 --> 00:18:03,300
get caught up in the we made 
this mistake or there was a 

321
00:18:03,300 --> 00:18:08,300
defect or the supplier is late 
or this engineer, you know, they

322
00:18:08,400 --> 00:18:11,800
missed a deadline and we can get
all caught up in kind of that 

323
00:18:12,600 --> 00:18:17,800
for the lack of a better term 
called all that drama of missed 

324
00:18:17,800 --> 00:18:20,600
expectations, right? 
So it's a great project manager 

325
00:18:20,600 --> 00:18:26,000
can Get caught up in the Miss 
expectation and say well or they

326
00:18:26,000 --> 00:18:26,900
can say. 
All right. 

327
00:18:26,900 --> 00:18:30,800
Well, this is the reality as it 
is right now and going forward 

328
00:18:30,800 --> 00:18:33,900
we want to do it this way and 
you you know, us and we know 

329
00:18:33,900 --> 00:18:37,100
that people make mistakes and 
you know, Miss deadlines and 

330
00:18:37,100 --> 00:18:39,500
that, you know, that's just part
of it, right? 

331
00:18:39,500 --> 00:18:42,200
And then, you know you, if 
you're doing software, you 

332
00:18:42,200 --> 00:18:45,400
rather through test and then it 
fails test in your account and 

333
00:18:45,400 --> 00:18:48,400
then you get to go do back and 
loop it, Loop it back again or, 

334
00:18:48,900 --> 00:18:52,900
you know, you didn't get the 
Certification that you wanted to

335
00:18:52,900 --> 00:18:55,600
get you know, and now you've got
to go back and change the 

336
00:18:55,600 --> 00:18:59,700
product again and you know, all 
of that stuff happens, but I 

337
00:18:59,700 --> 00:19:04,000
think the project manager can 
really have an influence on, you

338
00:19:04,000 --> 00:19:06,500
know, alright. 
Are we going to beat up the guy 

339
00:19:06,700 --> 00:19:09,500
that miss their deadlines? 
Are we going to just say? 

340
00:19:09,500 --> 00:19:14,700
All right, let's go well and of 
course, you know that we're all 

341
00:19:14,700 --> 00:19:20,100
humans here so we can get mad. 
Get mad. 

342
00:19:21,100 --> 00:19:23,800
That happens to and and that's 
all right. 

343
00:19:23,800 --> 00:19:26,300
I'm just thinking that the 
project manager really has to 

344
00:19:26,300 --> 00:19:28,500
think about. 
All right, what's coming next? 

345
00:19:28,600 --> 00:19:30,800
You know, what's going to be the
next obstacle? 

346
00:19:30,800 --> 00:19:34,500
Who needs to address that? 
So if you think about what the 

347
00:19:34,500 --> 00:19:38,100
project managers doing the 
project managers looking ahead 

348
00:19:38,100 --> 00:19:44,100
how far ahead, you know, you we 
don't know and anticipating 

349
00:19:44,200 --> 00:19:48,800
what's coming up and making sure
that certainly nowhere. 

350
00:19:48,800 --> 00:19:53,400
He's my phone there. 
The, you know, the project 

351
00:19:53,400 --> 00:19:57,100
manager can be proactive in that
kind of stuff. 

352
00:19:57,400 --> 00:20:02,900
And it's not, you know, we're 
not being authoritarian. 

353
00:20:02,900 --> 00:20:05,000
We're not, you know, beating 
people up. 

354
00:20:05,000 --> 00:20:06,700
You know, what we're at, what 
we're doing is were saying, hey,

355
00:20:06,700 --> 00:20:10,200
you know, here's the expectation
and, you know, thanks for coming

356
00:20:10,200 --> 00:20:13,500
to the meeting, but the meeting 
is not about reporting, you 

357
00:20:13,500 --> 00:20:15,200
know, if you want to report, 
will have a separate meeting 

358
00:20:15,200 --> 00:20:16,900
about that. 
This is about planning our 

359
00:20:16,900 --> 00:20:18,800
activities for the next for the 
next step. 

360
00:20:18,800 --> 00:20:22,700
And that's the most important. 
You know, in terms of and of 

361
00:20:22,700 --> 00:20:25,100
course, you know, when we have 
these conflicts, you know that 

362
00:20:25,300 --> 00:20:28,100
we're you know, we're missing 
deadlines or you got somebody on

363
00:20:28,100 --> 00:20:30,000
the project. 
It can't deliver when they're 

364
00:20:30,000 --> 00:20:36,900
supposed to excuse me, then it's
up to the project manager to do 

365
00:20:36,900 --> 00:20:39,000
a dive on that and say why, 
right? 

366
00:20:39,000 --> 00:20:41,900
And I think that a lot of times 
what happens is we don't even 

367
00:20:41,900 --> 00:20:45,500
consider the fact that, hey, 
this guy's not going to get a 

368
00:20:45,700 --> 00:20:50,900
bonus or his, his other, his 
real boss, or her real boss is 

369
00:20:51,200 --> 00:20:55,000
Give them a problem. 
If they do what you want to do. 

370
00:20:55,000 --> 00:20:56,800
And I think that is a project 
manager. 

371
00:20:57,200 --> 00:20:59,400
We have to be sensitive to that 
and say, well, listen, you know,

372
00:20:59,400 --> 00:21:02,800
it's not this guy's fault that 
he's stuck in a conflict. 

373
00:21:02,800 --> 00:21:04,400
Right? 
So, you know, the project 

374
00:21:04,400 --> 00:21:06,900
manager can look for those 
conflicts and be more of a 

375
00:21:06,900 --> 00:21:12,400
conflict resolution person than 
a task manager because we 

376
00:21:12,400 --> 00:21:14,500
already, you know, we don't have
the project manager to be the 

377
00:21:14,500 --> 00:21:16,400
task manager, right? 
The task police. 

378
00:21:16,400 --> 00:21:18,800
That's not what we want. 
Absolutely. 

379
00:21:19,200 --> 00:21:24,100
So now I Lost my truth. 
Well, well Greg, you know, 

380
00:21:24,300 --> 00:21:25,700
you're learning all of this, 
right? 

381
00:21:25,700 --> 00:21:29,700
In terms of why projects fail, 
you're taking in some of what 

382
00:21:29,700 --> 00:21:32,800
Mark has written on this. 
And how has that really shaped 

383
00:21:32,800 --> 00:21:35,100
your understanding of project 
execution. 

384
00:21:35,100 --> 00:21:36,500
How does that intertwine with 
everything? 

385
00:21:36,500 --> 00:21:44,000
You've been learning? 
Well, I think overall, Got the 

386
00:21:44,000 --> 00:21:46,400
mascot in the background there. 
I was going to say, I think your

387
00:21:46,400 --> 00:21:48,200
dog has something to say about 
it. 

388
00:21:50,600 --> 00:21:53,800
Well, you know, he might have a 
couple of project failures and 

389
00:21:53,808 --> 00:21:56,500
he's handling it wrong. 
I think my dog is now talking to

390
00:21:56,500 --> 00:21:57,400
your dog. 
This is great. 

391
00:22:03,600 --> 00:22:07,000
Yes. 
So for me, I've been really 

392
00:22:07,400 --> 00:22:10,600
trying to differentiate and I'm 
trying to differentiate well 

393
00:22:11,200 --> 00:22:12,700
where things happen as it 
relates to. 

394
00:22:12,800 --> 00:22:16,100
Planning and execution. 
So I'm very focused on the 

395
00:22:16,100 --> 00:22:19,500
execution aspect of things. 
And what I'm actually finding 

396
00:22:19,500 --> 00:22:22,200
out when I take what I learned 
from you, and what I learned 

397
00:22:22,200 --> 00:22:25,600
from Mark and then what? 
I put my own spin on, when I'm 

398
00:22:25,600 --> 00:22:29,500
out talking to people about it. 
I'm finding that most people, I 

399
00:22:29,500 --> 00:22:32,200
even did a survey recently 
didn't get a heavy response. 

400
00:22:32,200 --> 00:22:37,000
But I did a survey in the 
majority of people think that 

401
00:22:37,000 --> 00:22:40,600
their projects fail in the 
planning phase, and I'm not 

402
00:22:40,600 --> 00:22:42,200
saying plans aren't important. 
They are. 

403
00:22:42,800 --> 00:22:45,500
Absolutely critical, but what 
I've really learned where I'm at

404
00:22:45,500 --> 00:22:49,300
right now today is your plan is 
great, but it can't see what 

405
00:22:49,300 --> 00:22:53,700
didn't happen yet. 
And that's why execution is the 

406
00:22:53,700 --> 00:22:58,200
key execution is the only place 
a project can actually fail. 

407
00:22:59,000 --> 00:23:03,400
If kids in the view that's been 
shaped for me thus far, that's 

408
00:23:03,400 --> 00:23:08,200
where you're going to find the 
most impactful way to drive your

409
00:23:08,200 --> 00:23:11,000
project. 
What's late for you? 

410
00:23:11,400 --> 00:23:14,100
Let's dig in there. 
Because why do you think then 

411
00:23:14,100 --> 00:23:17,900
that the survey response was so 
heavy on the on that part of the

412
00:23:17,900 --> 00:23:21,600
project? 
And he thought, I actually think

413
00:23:21,600 --> 00:23:29,700
that we are all often trained 
that way by our jobs, by life 

414
00:23:30,000 --> 00:23:32,700
and process in and of itself is 
process. 

415
00:23:32,800 --> 00:23:36,900
It's a great thing, it really 
is, but when you've set a plan 

416
00:23:37,000 --> 00:23:41,300
and initiated process, now, Now 
what happens, what happens when 

417
00:23:41,300 --> 00:23:44,900
the things come up that my plan 
could not have possibly seen 

418
00:23:45,600 --> 00:23:48,100
what happens when I discover 
something. 

419
00:23:48,100 --> 00:23:52,400
Like, well, we are actually 
taking our plan putting it into 

420
00:23:52,500 --> 00:23:54,900
motion and we're finding that 
the people that are a part of 

421
00:23:54,900 --> 00:23:58,100
that plan are overestimating. 
In other words, putting in too 

422
00:23:58,100 --> 00:24:01,100
much safe. 
Time on their estimated 

423
00:24:01,100 --> 00:24:05,100
completions. 
So it has an impact that, sorry 

424
00:24:05,100 --> 00:24:09,100
about that, an impact, that 
permeates the project execution.

425
00:24:09,100 --> 00:24:13,000
It It's showing up throughout. 
So I think the reason people 

426
00:24:13,000 --> 00:24:15,600
responded in that way, as they 
think, that's where it happens. 

427
00:24:15,600 --> 00:24:19,400
And interestingly enough those 
that chose for example, 

428
00:24:19,400 --> 00:24:24,300
multitasking or unplanned 
constraints uncanny, unplanned 

429
00:24:24,300 --> 00:24:27,400
constraints are actually 
bottlenecks that you didn't see 

430
00:24:27,700 --> 00:24:32,100
in your plan. 
So it was the survey was 

431
00:24:32,100 --> 00:24:34,700
designed in a way to see what 
people really think. 

432
00:24:34,700 --> 00:24:38,100
Multitasking in. 
And of itself, actually is one 

433
00:24:38,100 --> 00:24:40,200
of the most problematic. 
Things that happens in the 

434
00:24:40,200 --> 00:24:44,500
execution phase because if 
you've got too much buffer on 

435
00:24:44,500 --> 00:24:48,100
what you're doing and she's got 
too much buffer on what she's 

436
00:24:48,100 --> 00:24:50,900
doing. 
It starts to create time gaps 

437
00:24:51,100 --> 00:24:54,800
where people aren't actually 
doing that for this project. 

438
00:24:54,900 --> 00:24:58,300
They're multitasking. 
The the reason multitasking is 

439
00:24:58,300 --> 00:25:03,200
such a bad thing is one. 
Person cannot do two things at 

440
00:25:03,200 --> 00:25:07,600
once with full force. 
It's not possible, right? 

441
00:25:07,600 --> 00:25:11,300
So the survey Was really 
designed to figure out what are 

442
00:25:11,300 --> 00:25:15,000
people thinking, and it's what I
suspected and it's what I'm what

443
00:25:15,000 --> 00:25:18,300
I'm really focused on now, so 
I'm trying to kind of stitch 

444
00:25:18,300 --> 00:25:21,200
that together and figure out how
to resolve it for people and 

445
00:25:21,200 --> 00:25:23,200
it's challenging because they 
know they have to change 

446
00:25:23,200 --> 00:25:26,100
behaviors and they don't really 
want to because then their boss 

447
00:25:26,100 --> 00:25:28,800
is going to say, what are you 
doing? 

448
00:25:30,200 --> 00:25:32,500
I'm trying to do well and 
they're like, well, yeah, but 

449
00:25:32,500 --> 00:25:35,300
what about this? 
So becomes a mess, you know, 

450
00:25:35,300 --> 00:25:40,000
it's interesting that dot to 
because when I Remember when I 

451
00:25:40,008 --> 00:25:44,100
was studying for the PNP and and
in some of the courses I was 

452
00:25:44,100 --> 00:25:46,600
taking that there was such a 
huge emphasis. 

453
00:25:46,600 --> 00:25:50,500
And I think it also, hovered 
around pmbok 6th edition where 

454
00:25:50,500 --> 00:25:54,100
there was a huge emphasis, and 
the inputs and outputs of what 

455
00:25:54,100 --> 00:25:59,600
you were doing in the planning 
stage and how it without saying 

456
00:25:59,600 --> 00:26:01,400
it directly to a project 
manager. 

457
00:26:01,400 --> 00:26:05,000
It almost felt like p.m. 
I was telling you that, that's 

458
00:26:05,000 --> 00:26:08,100
where your emphasis and all your
efforts should be placed all the

459
00:26:08,100 --> 00:26:11,200
time that you could. 
Put into planning, will solve 

460
00:26:11,200 --> 00:26:15,200
all the rest of the problems 
that come afterwards and and I 

461
00:26:15,200 --> 00:26:17,800
love the kind of the dichotomy 
of what you just said, Greg 

462
00:26:17,800 --> 00:26:21,700
versus what, at least the weight
my takeaways from when I was 

463
00:26:22,100 --> 00:26:26,900
really heavily into studying for
the PMP that I just felt like 

464
00:26:26,900 --> 00:26:30,600
there was some emphasis around 
the planning phase and that's 

465
00:26:30,600 --> 00:26:33,400
why I probably would have 
responded in that way to to the 

466
00:26:33,400 --> 00:26:38,300
survey where in fact you bring 
up some very very great and 

467
00:26:38,300 --> 00:26:41,400
valid points. 
Out the areas that were then the

468
00:26:41,400 --> 00:26:45,500
residual responses are really 
not happening in the planning 

469
00:26:45,500 --> 00:26:47,300
phase. 
Those are all in the execution 

470
00:26:47,300 --> 00:26:50,000
phase. 
So I think all great points. 

471
00:26:50,000 --> 00:26:52,500
Greg Mark, any thoughts here. 
Yeah. 

472
00:26:52,500 --> 00:26:57,200
Well Greg that Echoes, the 
research that I commissioned a 

473
00:26:57,208 --> 00:27:01,000
couple of years ago before I 
wrote my book, you know on 

474
00:27:01,100 --> 00:27:05,500
visual project management that 
you know, what do people think 

475
00:27:05,500 --> 00:27:07,700
the problem is. 
Most people think the problem is

476
00:27:07,700 --> 00:27:19,900
plans and If we thanks great. 
Surprisingly, you know, I don't 

477
00:27:19,900 --> 00:27:22,700
have the research, the research 
in front of me. 

478
00:27:22,700 --> 00:27:26,000
But if you're interested, you 
can go on our website and get 

479
00:27:26,000 --> 00:27:28,300
it. 
But, you know, we found that 

480
00:27:28,300 --> 00:27:30,400
most people think that the 
product, the reason, the 

481
00:27:30,400 --> 00:27:33,800
projects fail is planning. 
And and I think that's because, 

482
00:27:34,600 --> 00:27:38,800
you know, when you get into 
execution, You know, unexpected 

483
00:27:38,800 --> 00:27:41,800
things happen are like I should 
have done a better job planning.

484
00:27:41,800 --> 00:27:44,300
I should have, you know, I 
should have anticipated that. 

485
00:27:44,400 --> 00:27:46,300
Why wasn't this in the risk 
register? 

486
00:27:46,300 --> 00:27:49,200
Oh, we didn't do risk registers.
Oh, well, there's that as kind 

487
00:27:49,200 --> 00:27:55,100
of a planning part and I think. 
So what happens is people point 

488
00:27:55,100 --> 00:28:00,100
to a lack of planning because 
they get surprises during the 

489
00:28:00,100 --> 00:28:03,400
project and and of course, 
surprises are the very nature of

490
00:28:03,400 --> 00:28:05,400
projects and people will get 
that. 

491
00:28:05,600 --> 00:28:07,200
So I think that's what leads 
people to. 

492
00:28:07,300 --> 00:28:10,200
I think that it's the plan 
because they say oh, well, I 

493
00:28:10,208 --> 00:28:14,100
didn't expect this and it wasn't
because I didn't expect it, you 

494
00:28:14,100 --> 00:28:19,400
know, so therefore I did a bad 
job of planning and I think that

495
00:28:20,100 --> 00:28:23,200
think that project managers are 
too hard on themselves on their 

496
00:28:23,200 --> 00:28:26,000
planning ability because it's 
you know, you think about a 

497
00:28:26,000 --> 00:28:29,400
project plan, you know, you're 
predicting the future, you know,

498
00:28:29,500 --> 00:28:33,400
and who I mean, okay, you know, 
we might have built this steam 

499
00:28:33,400 --> 00:28:36,900
shovel, you know 20 times before
but this is a special one that 

500
00:28:36,900 --> 00:28:38,700
goes. 
On a boat or something, you know

501
00:28:38,700 --> 00:28:41,300
yaxha same and then you put it 
on the boat in the boat sinks. 

502
00:28:41,300 --> 00:28:44,600
Oh, well, you didn't think about
that, you know, so we must have 

503
00:28:44,600 --> 00:28:47,600
had a bad plan. 
So I think it's really just a 

504
00:28:48,700 --> 00:28:53,400
people are seeing these events 
during project execution that 

505
00:28:53,400 --> 00:28:58,700
they didn't expect and they say,
well, I didn't expect it without

506
00:28:58,700 --> 00:29:02,200
realizing that, that's just kind
of how we the Project's work and

507
00:29:02,200 --> 00:29:03,900
you're going to get weird stuff 
happening. 

508
00:29:03,900 --> 00:29:07,100
Know, someone's going to drive a
fork truck off the dock or you 

509
00:29:07,100 --> 00:29:10,100
know, You know, you're going to 
have a valve blow up or you 

510
00:29:10,100 --> 00:29:13,800
know, whatever that whatever the
unexpected event happens. 

511
00:29:14,200 --> 00:29:17,600
It's going to happen and you 
can't know what you don't know 

512
00:29:17,600 --> 00:29:19,100
until it happens. 
Yeah. 

513
00:29:19,100 --> 00:29:22,200
Yeah. 
Yeah, and it's not, I mean, you 

514
00:29:22,200 --> 00:29:26,100
can only plan, you know, for 
what you know now and project by

515
00:29:26,100 --> 00:29:32,500
their nature are unexpected. 
The uncertainty is what makes a 

516
00:29:32,500 --> 00:29:34,400
project a project, right? 
Otherwise, we'd be in 

517
00:29:34,400 --> 00:29:36,300
manufacturing, when you build a 
production line. 

518
00:29:36,300 --> 00:29:40,100
Otherwise it You know, now it's 
a project because we don't know.

519
00:29:40,400 --> 00:29:42,500
Yeah, absolutely. 
I mean and then when you think 

520
00:29:42,500 --> 00:29:44,600
about it, even in our everyday 
lives, right? 

521
00:29:44,700 --> 00:29:49,400
Consider consider the time that 
you you are planning a vacation 

522
00:29:49,400 --> 00:29:53,500
or something and you forgot all 
the kids jackets, I'm just 

523
00:29:53,700 --> 00:29:55,700
whatever. 
But you know, when you have the 

524
00:29:55,700 --> 00:29:59,500
conversation with your spouse, 
it's not it's not about oh, 

525
00:29:59,500 --> 00:30:02,100
well, we forgot the jackets. 
Let's just go buy new ones, you 

526
00:30:02,108 --> 00:30:04,700
know, you're not kind of caught 
in the moment you're thinking 

527
00:30:04,700 --> 00:30:07,000
about. 
Well, it's your fault because 

528
00:30:07,000 --> 00:30:09,000
when Were packing. 
You totally forgot. 

529
00:30:09,000 --> 00:30:12,000
So here you are now stuck in the
pattern over Munch. 

530
00:30:12,600 --> 00:30:14,500
Yeah, exactly. 
Didn't, you know, didn't you 

531
00:30:14,500 --> 00:30:16,400
look up the weather? 
You know, it's always again, 

532
00:30:16,400 --> 00:30:20,300
looking retrospectively at the 
past and blaming the part where 

533
00:30:20,600 --> 00:30:23,900
you were planning on on things 
and oh, you missed that. 

534
00:30:23,900 --> 00:30:27,500
So I think I think we're 
actually and let me know what 

535
00:30:27,500 --> 00:30:29,700
you both think about this, but I
do believe. 

536
00:30:29,700 --> 00:30:32,700
We'll start to see a shift here 
in terms of that response to 

537
00:30:32,700 --> 00:30:37,100
Greg survey because I feel like 
that is in many ways. 

538
00:30:37,300 --> 00:30:41,200
Is Antiquated thinking in terms 
of being stuck in the planning 

539
00:30:41,200 --> 00:30:44,500
phase and blaming everything on 
the planning phase where as we 

540
00:30:44,500 --> 00:30:48,500
get more and more hybrid or 
agile projects that are coming 

541
00:30:48,500 --> 00:30:50,900
to the Forefront. 
I feel like those types of 

542
00:30:50,900 --> 00:30:54,900
projects we spend maybe maybe 
two weeks planning maybe four 

543
00:30:54,900 --> 00:30:58,500
weeks at the most planning and 
then we just go, we go straight 

544
00:30:58,500 --> 00:31:01,200
to execution. 
We say we'll just figure it out 

545
00:31:01,200 --> 00:31:04,200
as we're executing as things 
come up and I feel like with 

546
00:31:04,200 --> 00:31:09,300
more of that type of those types
of projects being Being managed 

547
00:31:09,300 --> 00:31:12,300
by project managers that you 
might start to see a shift in 

548
00:31:12,300 --> 00:31:15,200
that response, from blaming it 
all on the past and the planning

549
00:31:15,200 --> 00:31:18,000
phase versus blame it on the 
execution part of it. 

550
00:31:18,500 --> 00:31:21,700
I think that's a really 
interesting take and because 

551
00:31:22,400 --> 00:31:25,700
something that you just said and
I think Mark would agree with 

552
00:31:25,700 --> 00:31:31,700
this is Plans are good. 
But execution is where it's 

553
00:31:31,700 --> 00:31:33,400
going to happen. 
And if you're executing in a 

554
00:31:33,408 --> 00:31:37,900
certain way, if your setup say, 
for example, using a Viewpoint 

555
00:31:37,900 --> 00:31:43,800
philosophy, your setup to see 
quicker mitigate faster, keep 

556
00:31:43,800 --> 00:31:47,000
the project moving. 
And what's interesting about 

557
00:31:47,000 --> 00:31:51,100
that whole thing is one of my 
side projects that I'm working 

558
00:31:51,100 --> 00:31:56,000
on is something. 
I was planning and planning and 

559
00:31:56,000 --> 00:31:57,700
planning. 
And I was like, I gotta get 

560
00:31:57,700 --> 00:31:59,900
Eddie, it's got to be like this.
It's got to be like that. 

561
00:31:59,900 --> 00:32:04,100
And one day I saw something 
where someone was talking about 

562
00:32:04,100 --> 00:32:12,400
this concept of stop that go and
I did and it started to make a 

563
00:32:12,400 --> 00:32:15,000
heck of a lot more sense. 
Because in the planning phase, I

564
00:32:15,000 --> 00:32:20,200
was stuck because I was trying 
to anticipate everything, you 

565
00:32:20,200 --> 00:32:22,300
can't do that. 
You can't possibly do that. 

566
00:32:22,300 --> 00:32:28,200
So, like, Mark says and and like
you say, if only we can Can get 

567
00:32:28,200 --> 00:32:32,300
moving and go that way, it'll, 
it'll kind of fill itself in and

568
00:32:32,300 --> 00:32:35,700
it sounds haphazard and 
Reckless, but it's actually not 

569
00:32:35,700 --> 00:32:38,500
because what you're doing is, 
you're simplifying and you're 

570
00:32:38,500 --> 00:32:42,200
allowing yourself the ability to
get unstuck and moving. 

571
00:32:43,000 --> 00:32:45,200
So it's a, it's a, it's a human 
concept. 

572
00:32:45,200 --> 00:32:49,000
That's applicable to our 
mechanized concepts of work, and

573
00:32:49,000 --> 00:32:50,500
project, delivery and all those 
things. 

574
00:32:50,500 --> 00:32:52,600
I hope that's a fair assessment.
It makes sense. 

575
00:32:53,000 --> 00:32:55,000
No, absolutely. 
And I think it kind of 

576
00:32:55,008 --> 00:32:57,300
intertwines with the question I 
had for Mark, which is, you 

577
00:32:57,300 --> 00:32:59,900
know, When is it good enough? 
When is it? 

578
00:32:59,900 --> 00:33:02,500
When is your plans? 
Good enough to just go? 

579
00:33:02,800 --> 00:33:06,200
I think you've done a little bit
of work and you've talked about 

580
00:33:06,200 --> 00:33:07,400
this. 
So would love to hear your 

581
00:33:07,400 --> 00:33:08,600
thoughts there. 
Yeah. 

582
00:33:08,900 --> 00:33:12,200
All right. 
Well, there's two kind of two, 

583
00:33:13,700 --> 00:33:15,800
two, two things. 
I don't think about, you know, 

584
00:33:15,800 --> 00:33:18,900
one is alright, if I'm planning 
a project for the first time. 

585
00:33:19,200 --> 00:33:22,700
All right, let's say that, you 
know, there's, there's two 

586
00:33:22,700 --> 00:33:26,400
different kinds of projects. 
There's the truly worn off, you 

587
00:33:26,400 --> 00:33:30,000
know, we've never done. 
Done this before kind or 

588
00:33:30,000 --> 00:33:34,400
anything like it kind of a 
project and you know, for that 

589
00:33:34,400 --> 00:33:38,800
kind of a project, you know, you
want to get your stakeholders. 

590
00:33:38,800 --> 00:33:41,500
The people were actually going 
to do the work or at least 

591
00:33:41,500 --> 00:33:43,700
eight, your subject matter 
experts in the room. 

592
00:33:43,700 --> 00:33:47,000
Making sure that you have all 
the relationships defined. 

593
00:33:47,000 --> 00:33:51,600
I think, what's good enough is 
we have a sense of what are the 

594
00:33:51,608 --> 00:33:55,400
relationships of all the tasks 
that have to be accomplished? 

595
00:33:55,400 --> 00:33:57,400
What are the deliverables that 
each one of those? 

596
00:33:57,800 --> 00:34:01,700
Tasks, you know, we've 
identified any stage gates in 

597
00:34:01,700 --> 00:34:06,500
the projects and we don't get 
too hung up on task estimation 

598
00:34:06,500 --> 00:34:09,900
task time estimation. 
I mean, you know, I always tell 

599
00:34:09,900 --> 00:34:14,400
people, look, that give me the, 
give me the green light time on 

600
00:34:14,400 --> 00:34:16,300
your task, Greenlight time 
means. 

601
00:34:16,300 --> 00:34:17,900
Listen, I'm going to drive to 
work today. 

602
00:34:18,000 --> 00:34:19,400
I get all green lights all the 
way. 

603
00:34:19,400 --> 00:34:23,500
It's going to take X, nothing's 
going to go wrong, you know, 

604
00:34:23,500 --> 00:34:25,500
it's going to take, you know, 
three weeks. 

605
00:34:25,500 --> 00:34:27,500
I'm not going to, I'm not going 
to call the new a meeting. 

606
00:34:27,699 --> 00:34:31,300
Or get sick or whatever thing 
might happen. 

607
00:34:31,600 --> 00:34:33,600
I'm going to devote 100% to this
task. 

608
00:34:33,600 --> 00:34:37,900
I think it's going to take X and
you know, that's good enough 

609
00:34:38,199 --> 00:34:40,500
because we put buffers in the 
project, right? 

610
00:34:40,500 --> 00:34:43,500
And say the project has a 
buffer, you don't have a buffer 

611
00:34:44,100 --> 00:34:45,699
and I understand if something 
goes wrong. 

612
00:34:45,699 --> 00:34:48,800
We're not going to beat you up 
because you made a bad estimate 

613
00:34:48,800 --> 00:34:50,500
on that. 
We got a buffer and that's what 

614
00:34:50,500 --> 00:34:55,100
that buffer is full right to 
absorb all of that under an 

615
00:34:55,100 --> 00:34:58,300
overestimation of task times. 
The big thing we Is what are the

616
00:34:58,308 --> 00:35:01,400
relationships of the tasks who's
going to own them? 

617
00:35:02,000 --> 00:35:06,100
And that is good enough. 
Now for a project where we have 

618
00:35:06,100 --> 00:35:10,700
a series of projects, like let's
say that we're an engineer to 

619
00:35:10,700 --> 00:35:14,000
order manufacturer and you know,
are we make? 

620
00:35:14,600 --> 00:35:19,800
I don't know, cabinets, kitchen 
cabinets or, you know, kitchen 

621
00:35:19,800 --> 00:35:23,300
cabinets are pretty simple. 
All right there boxes, but they 

622
00:35:23,300 --> 00:35:26,600
have all the boxes and drawers, 
and they have doors and, you 

623
00:35:26,600 --> 00:35:29,100
know, framing elements. 
And stuff like that, but then 

624
00:35:29,100 --> 00:35:31,300
you get into, okay. 
What's the Finish? 

625
00:35:31,300 --> 00:35:33,900
What kind of knobs we want? 
What's the door look like, you 

626
00:35:33,900 --> 00:35:35,800
know, there's all kind of like 
these different plug-in 

627
00:35:35,800 --> 00:35:38,100
variables to know. 
By the way, we're going to go to

628
00:35:38,100 --> 00:35:41,100
install this place that we've 
never installed before, you know

629
00:35:41,100 --> 00:35:44,200
for those kinds of projects. 
I'm looking at the history and 

630
00:35:44,200 --> 00:35:45,900
say, all right. 
Well, how long does stuff take 

631
00:35:45,900 --> 00:35:50,200
where are the management points?
And I'm just going to map out a 

632
00:35:50,200 --> 00:35:52,500
kind of just a simple flow chart
and say we're going to do this, 

633
00:35:52,500 --> 00:35:55,400
this this and then we're going 
to stop and approve and there 

634
00:35:55,400 --> 00:35:57,600
are no this Justice or stop on 
the proof. 

635
00:35:57,800 --> 00:36:02,600
So we build more of a swiveling 
Sharp than a project plan for 

636
00:36:02,600 --> 00:36:05,300
those kinds of projects because 
we don't need to do that. 

637
00:36:06,500 --> 00:36:09,100
The other thing I want to 
mention is something that Greg 

638
00:36:09,100 --> 00:36:11,500
touched on was, you know, hey 
stuff's going wrong with the 

639
00:36:11,500 --> 00:36:15,800
project and stuff in. 
I think a lot of people get 

640
00:36:15,800 --> 00:36:20,300
confused about the role of a 
risk register in the risk 

641
00:36:20,300 --> 00:36:23,700
management process in the 
planning process, right, you 

642
00:36:23,700 --> 00:36:26,400
know, because, you know, you you
make your plan and you say, 

643
00:36:26,600 --> 00:36:29,600
okay, if everything goes Goes 
according to plan, we're going 

644
00:36:29,600 --> 00:36:33,000
to be here. 
But here's the uncertainty in 

645
00:36:33,000 --> 00:36:37,400
the project. 
I did a, I did a project for a 

646
00:36:37,400 --> 00:36:42,600
company that was designing. 
A chip for the PS Sony. 

647
00:36:42,900 --> 00:36:44,000
PSP. 
PlayStations. 

648
00:36:44,000 --> 00:36:45,700
Right? 
And they were they were 

649
00:36:45,700 --> 00:36:49,300
upgrading the USB is going to 
use B to C. 

650
00:36:49,300 --> 00:36:52,200
So this is a couple of years, a 
couple of years ago and they're 

651
00:36:52,200 --> 00:36:55,600
like, man, we go to be when we 
go put that that that in the 

652
00:36:55,600 --> 00:36:57,600
ship then the chip melts and is 
hot. 

653
00:36:57,700 --> 00:37:00,700
You know, so you know, what we 
had to do was build kind of like

654
00:37:00,700 --> 00:37:03,800
a little off ramp and say, okay.
Well if we don't get this 

655
00:37:03,800 --> 00:37:05,900
problem solved, you know, then 
we're going to go do it this way

656
00:37:05,900 --> 00:37:08,900
and that happens. 
It's not part of the project 

657
00:37:08,900 --> 00:37:12,300
plan necessarily. 
It's more of a contingency 

658
00:37:12,300 --> 00:37:15,800
planning process. 
That happens outside of the 

659
00:37:15,900 --> 00:37:18,200
normal. 
What are the what are the steps 

660
00:37:18,200 --> 00:37:20,400
that we have to accomplish and 
what are the resources that we 

661
00:37:20,400 --> 00:37:23,200
have to accomplish? 
So good? 

662
00:37:23,200 --> 00:37:25,800
Enough is just, what 
understanding. 

663
00:37:25,800 --> 00:37:27,100
What is the work who's going to 
be? 

664
00:37:27,100 --> 00:37:28,800
Do it? 
What's the sequence? 

665
00:37:28,800 --> 00:37:31,300
And we don't get too hung up on 
how long does it take? 

666
00:37:31,300 --> 00:37:35,500
And we don't beat people up in 
execution because you said it 

667
00:37:35,508 --> 00:37:37,200
was going to take a week. 
And now it's taken three. 

668
00:37:37,200 --> 00:37:39,800
Well, you know, that's just 
that's just another form of the 

669
00:37:39,800 --> 00:37:42,500
other project plan, you know, 
the other problem certainty that

670
00:37:42,500 --> 00:37:45,600
I was talking about. 
So it really makes sense. 

671
00:37:45,600 --> 00:37:48,700
I'll I'm carrying that model 
with me all the time now and 

672
00:37:48,700 --> 00:37:51,200
just like Mark has told us what 
good enough means. 

673
00:37:51,200 --> 00:37:55,200
I think this podcast has been 
good enough for our audience. 

674
00:37:55,500 --> 00:37:58,300
See what I did there. 
So, You both. 

675
00:37:59,700 --> 00:38:03,500
Thank you both for joining me 
and speaking about why projects 

676
00:38:03,500 --> 00:38:05,700
fail. 
And also understanding that 

677
00:38:05,900 --> 00:38:08,200
there are moments where you have
to tell yourself. 

678
00:38:08,200 --> 00:38:10,200
It's good enough. 
Let's just go Greg. 

679
00:38:10,200 --> 00:38:12,700
I love that also about what 
you've been working on. 

680
00:38:12,700 --> 00:38:15,200
So, looking forward to seeing 
what that's all about to. 

681
00:38:15,400 --> 00:38:17,300
So that will do it for Mark 
Greg. 

682
00:38:17,300 --> 00:38:19,700
And I, and this installment of 
the everyday p.m. 

683
00:38:19,700 --> 00:38:23,400
Podcast Mark for those that want
to continue this conversation 

684
00:38:23,400 --> 00:38:25,200
with you. 
Where can they find you online? 

685
00:38:25,900 --> 00:38:30,300
You can go to projects in. 
Less time.com and you'll find 

686
00:38:30,300 --> 00:38:33,100
all of the books and white 
papers. 

687
00:38:33,100 --> 00:38:36,100
There's no Gateway that you have
to enter your e-mail. 

688
00:38:36,100 --> 00:38:37,700
I just want to have a material 
out there. 

689
00:38:37,900 --> 00:38:39,200
First. 
You got to go to Amazon to buy 

690
00:38:39,200 --> 00:38:42,200
my book projects visual project 
management, but you know, 

691
00:38:42,200 --> 00:38:45,100
there's that definitely. 
How do I support you? 

692
00:38:45,500 --> 00:38:48,200
Absolutely. 
And Greg, what about if folks 

693
00:38:48,200 --> 00:38:52,700
want to follow, you know for me 
you can find me on LinkedIn. 

694
00:38:52,800 --> 00:38:56,000
Greg kristensen, you'll see the 
project Hub stuff and few other 

695
00:38:56,000 --> 00:39:00,200
things hopefully to get And then
you could also go to Project 

696
00:39:00,200 --> 00:39:02,000
help.com. 
And if you were to sign up, 

697
00:39:02,000 --> 00:39:04,600
that's because you're intending 
to try it out, get in there and 

698
00:39:04,600 --> 00:39:07,100
have some fun with it. 
And you'll reach me that way 

699
00:39:07,100 --> 00:39:09,400
because I'm typically going to 
have visibility to that when 

700
00:39:09,400 --> 00:39:12,500
people engage and those are the 
two ways for me. 

701
00:39:13,500 --> 00:39:17,000
Well, it's been a pleasure to 
speak with you both again, and I

702
00:39:17,000 --> 00:39:20,200
hope to see you back on the 
podcast for another engaging 

703
00:39:20,200 --> 00:39:22,500
topic. 
I think we can go off on good 

704
00:39:22,500 --> 00:39:25,100
enough in another complete 
series of this. 

705
00:39:25,100 --> 00:39:28,600
So folks you can also find me on
on LinkedIn if you want to 

706
00:39:28,607 --> 00:39:31,300
connect as well as the everyday 
p.m..com. 

707
00:39:31,400 --> 00:39:33,100
Make sure to support the 
everyday p.m. 

708
00:39:33,100 --> 00:39:35,200
Podcast. 
We're on all of your podcasting 

709
00:39:35,200 --> 00:39:37,900
platforms Spotify. 
Google play, Apple podcast. 

710
00:39:37,900 --> 00:39:39,900
You name it? 
Give us a five star review. 

711
00:39:39,900 --> 00:39:42,700
Leave us a great comment. 
Let us know what you think about

712
00:39:42,700 --> 00:39:45,200
why projects fail. 
You can also watch the video 

713
00:39:45,200 --> 00:39:48,800
version of this and see Mark 
scrambled for his phone and Greg

714
00:39:48,800 --> 00:39:52,000
tell his dog to stop barking. 
And me tell my dog to stop 

715
00:39:52,000 --> 00:39:54,800
barking as well. 
You could watch us do all of 

716
00:39:54,800 --> 00:39:57,500
these shenanigans on my YouTube 
channel. 

717
00:39:57,700 --> 00:40:00,300
Tom Ford, slash and campea while
you're there. 

718
00:40:00,300 --> 00:40:03,100
Subscribe to the channel. 
Click like on this video, leave 

719
00:40:03,100 --> 00:40:06,500
us a comment and click that Bell
for notifications of when new 

720
00:40:06,500 --> 00:40:09,800
content goes up, so that will do
it for all of us. 

721
00:40:09,900 --> 00:40:12,800
Thanks so much for joining me 
and Mark and great. 

722
00:40:12,800 --> 00:40:14,900
And until next time. 
Take care.