Welcome to Safe As Quick as O3. 
Today we're covering the ACDC 

2
00:00:13,040 --> 00:00:17,480
concept from the Construction 
Safety Research Alliance, part 

3
00:00:17,480 --> 00:00:20,320
of broader work on high energy 
control frameworks. 

4
00:00:21,200 --> 00:00:26,160
The key principle is a focus on 
high energy hazards, which can 

5
00:00:26,160 --> 00:00:29,400
lead to serious injuries and 
fatalities or Sifts. 

6
00:00:30,120 --> 00:00:33,880
ACDC is alternative controls and
direct controls. 

7
00:00:34,680 --> 00:00:39,200
For direct controls or DC's, 
these are essential for 

8
00:00:39,200 --> 00:00:43,720
eliminating or mitigating high 
energy hazards and specifically 

9
00:00:43,720 --> 00:00:46,760
targeting and mitigating the 
energy source itself or the 

10
00:00:46,760 --> 00:00:50,080
exchange of the energy. 
Key requirements for a direct 

11
00:00:50,080 --> 00:00:52,960
control include being 
specifically targeted to the 

12
00:00:52,960 --> 00:00:56,680
high energy source, effectively 
mitigating exposure when 

13
00:00:56,680 --> 00:01:00,640
properly installed, verified, 
and used, and remaining 

14
00:01:00,640 --> 00:01:02,800
effective even when someone 
makes a mistake. 

15
00:01:03,760 --> 00:01:06,600
Again, direct controls are 
designed to mitigate or disrupt 

16
00:01:06,600 --> 00:01:08,920
exchanges of hazardous energy 
with the target. 

17
00:01:09,760 --> 00:01:13,280
Alternative controls were ACS 
When a direct control isn't 

18
00:01:13,280 --> 00:01:17,280
feasible, at least 2 alternative
controls were required, drawn 

19
00:01:17,280 --> 00:01:19,960
from at least two or more of 
three specific categories, which

20
00:01:19,960 --> 00:01:22,920
I'll cover shortly. 
ACS are a system of 

21
00:01:22,920 --> 00:01:26,160
complementary controls primarily
designed to reduce the 

22
00:01:26,160 --> 00:01:29,440
likelihood of human error and 
variability, rather than solely 

23
00:01:29,440 --> 00:01:33,640
reducing energy levels. 
In oil and gas terms, we might 

24
00:01:33,640 --> 00:01:37,920
consider direct control as a 
full barrier and consider the 

25
00:01:38,080 --> 00:01:40,560
alternative controls as a type 
of safeguard. 

26
00:01:41,160 --> 00:01:43,880
Safeguards are controls that 
don't meet the definition of a 

27
00:01:43,880 --> 00:01:46,520
full barrier, but are still 
important for maintaining 

28
00:01:46,520 --> 00:01:49,560
barrier effectiveness or for 
some other safety goals. 

29
00:01:50,600 --> 00:01:52,840
The three categories for 
alternative controls are 

30
00:01:53,000 --> 00:01:56,000
physical obstacles. 
This is an obstruction block in 

31
00:01:56,000 --> 00:01:59,280
the path to the high energy 
hazard like barriers, cones or 

32
00:01:59,280 --> 00:02:01,440
bunting. 
Dedicated monitoring. 

33
00:02:01,440 --> 00:02:04,200
So this is continuous attention 
to the high energy hazard. 

34
00:02:04,200 --> 00:02:08,440
So monitoring alarms and 
spotters and visual reminders. 

35
00:02:08,479 --> 00:02:11,360
A visible warning of the high 
energy hazard's presence. 

36
00:02:11,400 --> 00:02:15,640
So signage and painted lines. 
For alternative controls to be 

37
00:02:15,640 --> 00:02:19,120
effective, they must be in place
during the work and specifically

38
00:02:19,120 --> 00:02:21,680
target the high energy hazard 
intentionally. 

39
00:02:22,280 --> 00:02:25,400
They often require supporting 
processes such as job safety 

40
00:02:25,400 --> 00:02:27,680
analysis and pre job briefs or 
permits. 

41
00:02:28,400 --> 00:02:32,520
Furthermore, all workers 
creating or exposed to the high 

42
00:02:32,520 --> 00:02:37,680
energy hazard must have verified
specialty training, a form of 

43
00:02:37,680 --> 00:02:41,920
safe work planning and a pre job
brief directly related to the 

44
00:02:41,920 --> 00:02:44,960
high energy hazard. 
And those safeguarding controls,

45
00:02:46,040 --> 00:02:50,680
notably experience, general 
rules and situational awareness 

46
00:02:50,680 --> 00:02:54,360
of the person at risk are not 
considered alternative controls.

47
00:02:54,360 --> 00:02:58,280
They don't meet the definition. 
Now specific rules apply to 

48
00:02:58,280 --> 00:03:03,120
elements like spotters, which by
this framework requires sole 

49
00:03:03,120 --> 00:03:05,680
duty of continuous monitoring 
and communication. 

50
00:03:06,080 --> 00:03:08,800
So the spotters only role has to
be spotting. 

51
00:03:08,800 --> 00:03:11,320
They can't be doing other things
flaggers. 

52
00:03:11,720 --> 00:03:15,400
So it needs to be dedicated 
attention, communication. 

53
00:03:16,040 --> 00:03:18,920
It needs to be clear, 
unambiguous, uninterrupted and 

54
00:03:18,920 --> 00:03:22,880
specific. 
And signage, it's a communicate 

55
00:03:22,880 --> 00:03:26,280
unusual or hidden hazards and 
ensuring there's a really 

56
00:03:26,440 --> 00:03:29,120
thorough understanding of the 
hazardous conditions. 

57
00:03:30,000 --> 00:03:33,360
That means generic signage 
that's not communicating unusual

58
00:03:33,360 --> 00:03:36,600
or hidden hazards or novel 
information don't meet the 

59
00:03:36,600 --> 00:03:38,240
definition of an alternative 
control. 

60
00:03:39,120 --> 00:03:41,720
So this framework, this 
hierarchy of controls places 

61
00:03:41,720 --> 00:03:45,640
direct controls, which is again 
directly addressing energy and 

62
00:03:45,640 --> 00:03:49,320
alternative controls, addressing
human error, variability and 

63
00:03:49,320 --> 00:03:52,360
some other things places them 
within a broader framework that 

64
00:03:52,360 --> 00:03:56,280
includes energy elimination, 
energy reduction and energy 

65
00:03:56,280 --> 00:03:58,680
isolation. 
Let me know your experience of 

66
00:03:58,680 --> 00:04:03,160
applying ACDC or the broader 
high energy frameworks like 

67
00:04:03,160 --> 00:04:05,440
Hecker. 
That's it on this quicker side 

68
00:04:05,440 --> 00:04:07,280
of safe as. 
Thanks everyone.