1
00:00:00,040 --> 00:00:02,600
When something goes wrong in 
seconds, do you blame the 

2
00:00:02,600 --> 00:00:06,360
operator or the 10 decisions 
that made failure virtually 

3
00:00:06,360 --> 00:00:09,680
inevitable? 
In 2016, Dreamworld's Thunder 

4
00:00:09,680 --> 00:00:13,240
River Rapids ride malfunctioned 
and four visitors died. 

5
00:00:13,280 --> 00:00:16,840
The junior ride operator closest
to the emergency stop button 

6
00:00:17,040 --> 00:00:19,000
didn't press it. 
A family member of two of the 

7
00:00:19,000 --> 00:00:22,360
bereaved yelled at the operator.
Why didn't you stop the ride? 

8
00:00:22,400 --> 00:00:24,160
All these feelings are 
understandable. 

9
00:00:24,480 --> 00:00:27,240
The question is too narrow to 
understand the disaster. 

10
00:00:27,640 --> 00:00:32,200
Instead, the authors in today's 
study argue that at least nine 

11
00:00:32,200 --> 00:00:35,440
latent valleys were already in 
place, quietly weakened the 

12
00:00:35,440 --> 00:00:37,680
system long before the day of 
the tragedy. 

13
00:00:37,680 --> 00:00:40,320
Good day everyone, welcome to 
Safe as I'm Doctor Ben 

14
00:00:40,320 --> 00:00:43,120
Hutchinson. 
Today's study is from Gregson 

15
00:00:43,120 --> 00:00:47,960
and Quinlan 2024, titled Death 
of Dreamworld 10 Pathways to 

16
00:00:47,960 --> 00:00:51,200
Disaster and Failure to Learn, 
published in the Economic and 

17
00:00:51,200 --> 00:00:55,680
Labour Relations Review. 
On the 25th of October 2016, the

18
00:00:55,680 --> 00:00:57,640
Thunder River Rapids ride 
malfunctioned. 

19
00:00:57,720 --> 00:01:01,120
A pump designed to regulate 
water levels stopped, water 

20
00:01:01,120 --> 00:01:04,879
levels dropped, a raft became 
grounded on conveyor belts and a

21
00:01:04,879 --> 00:01:08,880
second raft collided, flipped 
and the adult occupants were 

22
00:01:08,880 --> 00:01:10,440
thrown into machinery and 
killed. 

23
00:01:10,920 --> 00:01:13,720
Two children survived. 
Using Quinlan's 10 pathways to 

24
00:01:13,720 --> 00:01:16,080
failure model, the authors 
unpack had drawing well, 

25
00:01:16,120 --> 00:01:19,640
followed similar patterns, 
Pathway one engineering, design 

26
00:01:19,640 --> 00:01:22,360
and maintenance flaws The 
coroner found multiple failures 

27
00:01:22,360 --> 00:01:24,000
in design, engineering and 
maintenance. 

28
00:01:24,400 --> 00:01:28,440
The ride was built in house in 
the mid 80s with few surviving 

29
00:01:28,440 --> 00:01:30,200
records. 
The authors point out the ride 

30
00:01:30,200 --> 00:01:33,280
speed and sequencing made key 
components tightly coupled, 

31
00:01:33,320 --> 00:01:35,840
meaning little slack for 
recovery if something fails. 

32
00:01:35,960 --> 00:01:38,160
After the incident. 
An inspector found the ride in 

33
00:01:38,160 --> 00:01:41,600
generally poor condition with 
significant corrosion evidence 

34
00:01:41,600 --> 00:01:44,760
throughout the steel components 
and concrete degradation in 

35
00:01:44,760 --> 00:01:46,920
tunnels. 
The coroner noted that the basic

36
00:01:46,920 --> 00:01:49,520
engineering controls like an 
interlocking shutdown if the 

37
00:01:49,520 --> 00:01:53,840
water pump failed, and a single 
clear emergency stop may have 

38
00:01:53,840 --> 00:01:57,520
prevented the deaths pathway to 
failure to heed warning signs. 

39
00:01:57,520 --> 00:02:00,960
This wasn't a surprise with no 
signal, at least in hindsight. 

40
00:02:01,400 --> 00:02:04,320
The paper details a history of 
high potential incidents on the 

41
00:02:04,320 --> 00:02:07,600
same right in 2001. 
Moving in stationary rafts 

42
00:02:07,600 --> 00:02:10,960
collided and a raft flipped 
before guests bought it. 

43
00:02:11,320 --> 00:02:14,320
A manager emailed leadership. 
I shudder what I think if they'd

44
00:02:14,320 --> 00:02:16,560
been guests on that riot. 
There were further incidents in 

45
00:02:16,560 --> 00:02:21,400
2004 and five in 2008 and 14, 
including raft spacing issues, 

46
00:02:21,400 --> 00:02:24,520
sensor faults and evacuations. 
The authors argued that learning

47
00:02:24,520 --> 00:02:28,240
was patchy and often dominated 
by administrative tweaks rather 

48
00:02:28,240 --> 00:02:30,160
than deeper redesign or 
automation. 

49
00:02:30,160 --> 00:02:33,520
Pathway 3 flaws and risk 
assessment Risk assessment was 

50
00:02:33,520 --> 00:02:36,960
described as fragmented and 
poorly documented, the coroner 

51
00:02:36,960 --> 00:02:39,240
observed. 
It does not appear that risk 

52
00:02:39,240 --> 00:02:41,800
assessments of rides within the 
park were carried out. 

53
00:02:41,800 --> 00:02:44,440
They were very ad hoc. 
The paper stresses a basic 

54
00:02:44,440 --> 00:02:45,800
point. 
There's no record. 

55
00:02:45,800 --> 00:02:48,600
Investigators and regulators now
often assume it didn't happen. 

56
00:02:48,600 --> 00:02:51,920
And even if it did, undocumented
assessments can't be reviewed, 

57
00:02:52,080 --> 00:02:54,480
tested or improved. 
Though I suspect some of my 

58
00:02:54,480 --> 00:02:56,920
lawyer friends might disagree 
with this whole if it's not 

59
00:02:56,920 --> 00:02:58,320
documented, did it really 
happen? 

60
00:02:58,320 --> 00:03:02,080
Argument pathway 4 Flaws in 
management systems The safety 

61
00:03:02,080 --> 00:03:05,560
management system isn't just a 
folder of procedures, it has to 

62
00:03:05,560 --> 00:03:07,720
work in practise. 
Dreamworld's operating 

63
00:03:07,720 --> 00:03:11,320
procedures were found to be 
ambiguous and poorly coordinated

64
00:03:11,320 --> 00:03:13,280
across departments. 
The coroner concluded the 

65
00:03:13,280 --> 00:03:16,520
procedures for the right were 
ambiguous and poorly worded and 

66
00:03:16,520 --> 00:03:19,480
that operating procedures were 
drafted with minimal input from 

67
00:03:19,480 --> 00:03:22,400
technical and safety staff. 
Training was also criticised. 

68
00:03:22,840 --> 00:03:26,080
Operators were not adequately 
trained to recognise immediate 

69
00:03:26,080 --> 00:03:29,640
danger conditions for the right.
People also cites organisational

70
00:03:29,640 --> 00:03:31,800
siloing. 
The former head of safety 

71
00:03:31,800 --> 00:03:34,760
described failures to share 
safety knowledge and a media 

72
00:03:34,760 --> 00:03:38,560
quote attributed to him says for
some risks in the park everyone 

73
00:03:38,560 --> 00:03:40,480
thought it was someone else's 
responsibility. 

74
00:03:40,480 --> 00:03:43,080
Pathway 5. 
Flaws in system ordinary orders 

75
00:03:43,080 --> 00:03:45,120
existed. 
The quality and follow through 

76
00:03:45,120 --> 00:03:47,720
were major issues. 
Earlier external audits were 

77
00:03:47,720 --> 00:03:50,760
criticised for focusing on 
aesthetic issues rather than 

78
00:03:50,760 --> 00:03:52,760
proper safety assessment against
standards. 

79
00:03:52,800 --> 00:03:55,920
Later audit scored Dreamworld 
poorly on safety documentation 

80
00:03:55,920 --> 00:03:58,800
and compliance and the coroner 
noted not all recommendations 

81
00:03:58,800 --> 00:04:01,000
were even implemented. 
An engineer performing annual 

82
00:04:01,000 --> 00:04:04,560
inspections issued certification
without being supplied essential

83
00:04:04,560 --> 00:04:07,240
documentation and the coroner 
referred him to the professional

84
00:04:07,240 --> 00:04:09,280
board. 
Pathway 6 Economic and 

85
00:04:09,280 --> 00:04:11,240
production pressures 
compromising safety. 

86
00:04:11,280 --> 00:04:14,080
This pathway is often hard to 
investigate and the authors 

87
00:04:14,080 --> 00:04:15,960
argue it's frequently under 
examined. 

88
00:04:16,279 --> 00:04:18,760
Not evidence of budget pressures
affecting maintenance and 

89
00:04:18,800 --> 00:04:20,600
safety. 
Resourcing meeting minutes 

90
00:04:20,600 --> 00:04:23,680
reportedly stated revenue is up 
but profit is down. 

91
00:04:23,920 --> 00:04:26,800
Cutbacks have now been enforced 
and repairs and maintenance 

92
00:04:26,800 --> 00:04:29,240
spending needs to stop while 
capital expenditure and new 

93
00:04:29,240 --> 00:04:32,760
attractions continued. 
Pathway 7 failures in regulatory

94
00:04:32,800 --> 00:04:36,880
oversight regulation cops some 
serious criticism registration 

95
00:04:36,920 --> 00:04:39,880
inspections were overdue and had
been granted extensions. 

96
00:04:39,880 --> 00:04:42,360
The coroner discussed post 
incident reforms including 

97
00:04:42,440 --> 00:04:45,560
stronger inspection regimes and 
a safety case approach, 

98
00:04:45,600 --> 00:04:48,880
recognising that theme parks are
high hazard workplaces. 

99
00:04:48,960 --> 00:04:52,400
Pathway 8 Concerns raised by 
workers or others that were 

100
00:04:52,400 --> 00:04:54,720
ignored. 
A key piece of evidence is the 

101
00:04:54,720 --> 00:04:58,040
Australian Workers Union memo to
the regulator 20 months before 

102
00:04:58,040 --> 00:04:59,880
the deaths. 
It warned that single operator 

103
00:04:59,880 --> 00:05:01,800
staffing was a disaster waiting 
to happen. 

104
00:05:02,200 --> 00:05:04,360
It asked for a full 
investigation ASAP. 

105
00:05:04,360 --> 00:05:06,640
The authors note this memo is 
not referenced in the coronial 

106
00:05:06,640 --> 00:05:09,680
report and question how the 
inspectorate responded, though 

107
00:05:09,680 --> 00:05:13,840
notably in hindsight you often 
do find these rare sort of 

108
00:05:13,920 --> 00:05:16,560
whistleblowers who put their 
hand up and sometimes it's 

109
00:05:16,560 --> 00:05:19,520
really difficult to sort of 
differentiate the noise from the

110
00:05:19,520 --> 00:05:23,640
real early indicators and in 
hindsight it's always obvious. 

111
00:05:23,640 --> 00:05:26,360
Pathway 9. 
Poor communication or trust. 

112
00:05:26,400 --> 00:05:29,400
The paper suggests a climate 
where discipline and blame can 

113
00:05:29,400 --> 00:05:32,720
suppress reporting and speaking 
up, citing commentary that fear 

114
00:05:32,720 --> 00:05:34,800
and sanctioning can weaken 
communication. 

115
00:05:34,840 --> 00:05:37,400
They also point to weak systems 
for incident reporting and 

116
00:05:37,680 --> 00:05:41,200
tracking being underused because
they weren't user friendly. 

117
00:05:41,240 --> 00:05:43,680
Pathway 10. 
Flaws in emergency and rescue 

118
00:05:43,680 --> 00:05:47,320
procedures in emergencies. 
Task load control design matter,

119
00:05:47,640 --> 00:05:50,240
human factors evidence 
highlighted time sensitive 

120
00:05:50,240 --> 00:05:53,760
decision load, confusing 
emergency stop arrangements and 

121
00:05:53,760 --> 00:05:57,200
the challenge of coordinating 
action across separated operator

122
00:05:57,200 --> 00:05:58,640
positions. 
So what can we make of the 

123
00:05:58,640 --> 00:06:01,280
findings? 
The 10 pathways model can act as

124
00:06:01,280 --> 00:06:04,440
a structured self water template
before incidents occur and the 

125
00:06:04,440 --> 00:06:06,440
kind of checklist for high 
potential incident 

126
00:06:06,440 --> 00:06:08,640
investigations. 
Some take home lessons might be 

127
00:06:08,640 --> 00:06:11,800
to strengthen maintenance and 
engineering controls, especially

128
00:06:11,800 --> 00:06:14,720
automation and fail safe 
shutdowns for safety critical 

129
00:06:14,720 --> 00:06:17,520
functions. 
Make risk assessments real based

130
00:06:17,520 --> 00:06:20,920
on workers done conditions. 
Tap into the expertise and 

131
00:06:20,920 --> 00:06:23,760
warnings from people updated 
after incidents. 

132
00:06:23,960 --> 00:06:28,120
Modification staffing changes 
include modifications, change of

133
00:06:28,120 --> 00:06:31,240
management, staffing changes or 
repeated breakdowns. 

134
00:06:31,240 --> 00:06:34,040
Demand audits to test systems in
practise and not just 

135
00:06:34,040 --> 00:06:36,720
aesthetics, and ensure 
recommendations are completed, 

136
00:06:36,720 --> 00:06:40,200
tracked and verified even into 
the future and improve 

137
00:06:40,200 --> 00:06:42,400
regulatory capability and work 
of voice. 

138
00:06:42,840 --> 00:06:46,440
The paper supports safety case 
oversight and stronger empowered

139
00:06:46,440 --> 00:06:49,160
safety representation. 
That's it on Safe AS. 

140
00:06:49,160 --> 00:06:52,360
Please like, comment and 
subscribe to the channel and 

141
00:06:52,440 --> 00:06:54,400
links in comments if you'd like 